My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-07
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2003
>
2003-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:55:45 PM
Creation date
10/27/2010 3:35:37 PM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Doc #
TPM03-03VA03-01
Date
3/10/2003
Notes
E Tustin(17th&4th)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />24. The applicant shall contribute to the City of Santa Ana Sewer Connection <br />Fee at the cost of $63.32 per unit. <br />25. The applicant shall contribute to the Orange County Sanitation District <br />Connection Fee at the cost of $675.00 per 1,000 square feet of building <br />area. <br />26. Prior to issuance of a building permit, submit the final run-off evaluation for <br />review and approval showing existing and proposed facilities and methods <br />of draining the site without exceeding the capacity of any street or <br />adjacent storm drain facility. <br />27. Prior to issuance of a building permit, if required, construct an on-site/off- <br />site storm drain system. <br />28. Prior to the issuance of a grading permit, complete the following: <br />a. Prepare an NPDES post-construction storm water management <br />plan in accordance with the Orange County Drainage Area <br />Management Plan (DAMP) that includes all Structural and Non- <br />structural "Best Management Practices" for the project. <br />• <br />b. Submit and have approved a surface drainage/utility plan that <br />includes all Structural "Best Management Practices". <br />c. Provide two copies of the "Water Quality Management Plan" that <br />includes a description of all applicable Structural and Non- <br />structural "Best Management Practices" which may apply to this <br />project. <br />• <br />29. During the grading and construction period, the applicant shall place <br />sandbags around the site perimeter to prevent sediment-filled runoff from <br />being deposited in City storm drains. <br />30. Should any project-generated sediment be deposited in City storm drains, <br />the applicant shall fund any required clean-up to the mutual satisfaction of <br />the City and the applicant. <br />31. Exposed soils shall be covered with soil binding material by the applicant, <br />as soon as possible, to prevent soil erosion during storms. <br />32. Parking area maintenance and sweeping shall be conducted regularly to <br />reduce the amount of pollutants entering the City drainage system. <br />33. The applicant shall pay drainage Assessment Fees (Areas V) based on <br />$5,028.50 per acre. <br />Exhibit "B" <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.