Laserfiche WebLink
• 10. A watering plan shall be initiated for each grading phase such that a crust <br />can be formed on the ground surface to reduce the amount of generated <br />fugitive dust. <br />11. Construction roads shall be paved where appropriate. <br />12. All grading activities shall be ceased during periods of high wind. <br />13. Construction equipment shall be fitted with the most modern emission <br />control devices and kept in proper tune. <br />14. A Transportation Systems Management Plan for the proposed project <br />shall be submitted to the City by the applicant for approval. Such a plan <br />shall focus on reducing the amount of peak-hour traffic trips. <br />15. Bicycle racks shall be installed by the applicant on-site for use by <br />employees and patrons. <br />16. The applicant shall insulate hot water lines in water recirculating systems. <br />17. The applicant shall install low water use faucets in all structures. <br />• 18. The applicant shall install low-flush toilets in all structures. <br />19. The applicant shall ensure that all drinking fountains on-site are fitted with <br />self-closing valves. <br />20. The applicant shall incorporate drip-irrigation systems on-site for <br />landscape watering where appropriate and low water-consuming <br />vegetation shall be used on-site where possible. In addition, all <br />sprinklering devices shall be fitted with timers to reduce water waste. The <br />landscape irrigation system shall be transferred to a reclaimed water <br />system when it becomes available. <br />21. The applicant shall ensure that the water system has adequate pressure <br />for fire protection purposes. <br />22. Non-watering using methods of cleaning and maintenance shall be used <br />on the site. <br />23. The applicant shall work with the Orange County Sanitation District to <br />identify possible on-site methods of reducing the load strength of project- <br />generated wastewater. <br />• <br />Exhibit "B" <br />Page 2 of 5 <br />