My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ONE BROADWAY PLAZA, LLC 1A
Clerk
>
Contracts / Agreements
>
O
>
ONE BROADWAY PLAZA, LLC 1A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:25:52 PM
Creation date
10/28/2010 8:51:31 AM
Metadata
Fields
Template:
Contracts
Company Name
ONE BROADWAY PLAZA, LLC
Contract #
A-2010-206
Agency
PLANNING & BUILDING
Council Approval Date
7/19/2010
Expiration Date
7/19/2011
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Estimated Entity Funded Prior <br />Description of Improvement Cost (2004 Responsible to Indicated <br /> Dollars) For Triggering <br /> Improvement Event Cash <br />6. Restripe: (1) WB Santa Clara to provide $50,000 Owner Building <br />one LT lane and one shared LT/RT lane; Permit <br />(2) NB Grand Avenue from Fruit Street to <br />14th Street at Santa Ana Blvd/I-5 HOV <br />ramps to provide three NB travel lanes; (3) <br />I-5 NB off-ramps to provide a WB LT lane, <br />a shared LT/RT lane and a RT lane at <br />Grand Ave. <br />7. Remove existing on-street parking stalls $300,000 Owner Building <br />and parking meters on Main Street from Permit <br />Civic Center Dr. to Buffalo St.., restripe <br />and slurry seal this Main Street segment to <br />provide three NB and two SB travel lanes, <br />and construct median on Main St. south of <br />10th Street. <br />8. Acquire necessary ROW and construct $6,500,000 Owner, Final Map <br />southbound RT lane at Main/17th and unless City <br />Broadway/17th, including striping, traffic undertakes per <br />signal modification, and ADA compliant section 5.1.1 <br />wheel chair ramps. <br />9. Implement neighborhood traffic plans to $1,200,000 City Six month <br />mitigate changes in traffic patterns or (actual cost, prior to <br />increased cut through traffic resulting from not an issuance of <br />the One Broadway Plaza Project in French estimate) the first <br />Park, French Court, Willard, Floral Park, certificate of <br />West Floral Park, and Washington Square occupancy but <br />Neighborhoods. Traffic plans costs shall no later than <br />include traffic studies, staff time to process 22 month <br />neighborhood traffic plan, and the from the 1St <br />construction of appropriate semi-diverters, building <br />diagonal diverters, and street closures. permit
The URL can be used to link to this page
Your browser does not support the video tag.