My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-36
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2002
>
2002-36
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:56:05 PM
Creation date
11/4/2010 3:35:58 PM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Doc #
CUP02-25
Date
11/25/2002
Notes
762 S Harbor Blvd
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Conditions for Approval for Conditional Use Permit No. 2002-25 <br />Conditional Use Permit No. 2002-25 is approved subject to compliance, to the reasonable <br />satisfaction of the Planning Commission, with all applicable sections of the Santa Ana <br />Municipal Code, the California Administrative Code, the Uniform Fire Code, the Uniform <br />Building Code and all other applicable regulations. <br />The applicant must comply in full with each and every condition listed below rip or to <br />exercising the rights conferred by this conditional use permit. <br />The applicant must remain in compliance with all conditions listed below throughout the <br />life of the conditional use permit. Failure to comply with each and every condition may <br />result in the revocation of the conditional use permit. <br />A. Planning Division <br />1. The project shall remain in compliance with Site Plan Review DP No. 01- <br />49. <br />2. Any amendment to this conditional use permit must be submitted to the <br />Planning Division for review. At this time, staff will determine if <br />administrative relief is available or the conditional use permit must be <br />• amended. <br />B. MITIGATION MEASURES <br />1. A combination of berms and hedges need to be provided in the front yard <br />setback area to screen the drive-through aisle and reduce glare onto <br />Harbor Boulevard. <br />2. All materials excavated or graded will be sufficiently watered to prevent <br />excessive amount of dust. Watering with complete coverage shall occur <br />at least twice daily, once in the late morning and once after work is done <br />for the day. <br />3. All clearing and earthwork activities shall cease during period of high <br />winds (winds greater than 25 mph averaged over one hour) or during <br />Stage 1 or Stage 2 smog episodes. <br />4. Streets surrounding the project site should be cleaned at the end of each <br />day of construction. <br />5. All materials transported off-site shall either be sufficiently watered or <br />securely covered to prevent excessive amounts of dust. <br />• <br />Resolution No. 2002-36 <br />Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.