My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10A - 10-18-10 MINUTES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
11/15/2010
>
10A - 10-18-10 MINUTES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:57:38 PM
Creation date
11/10/2010 11:27:41 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
10A
Date
11/15/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> ? Transportation Systems Management (TSM) Alternative <br /> Explores what can be achieved with low level investments <br /> such as traffic signal synchronization <br /> Relatively inexpensive projects, operational improvements, <br /> or policy actions such as increases in existing bus service, <br /> improved signal timing, and incentives to carpooling. <br /> ? Streetcar 1 along Santa Ana Blvd. and 4th St. <br /> ? Streetcar 2 along Santa Ana Blvd. and 5th St. <br /> <br /> Streetcar 1 - Santa Ana Blvd./4th Street <br /> Streetcar 2 - Santa Ana Blvd./5th Street <br /> <br /> Refinements to Reduced Alternatives <br /> ? Streetcar 1 -Parking on 4th Street <br /> - Option 1: Remove diagonal parking along south side of 4th <br /> Street; widen sidewalk 16 feet on south side. <br /> - Option 2: Replace diagonal parking along south side of 4th <br /> Street with parallel parking; widen sidewalk 8 feet. <br /> ? Streetcar 2 - Civic Center Drive Loop <br /> <br /> Streetcar 1 - 4th Street Parking Option 1 <br /> ? Remove diagonal parking along south side of 4th Street; <br /> ? Widen sidewalk 16 feet on south side <br /> <br /> Streetcar 1 - 4th Street Parking Option 2 <br /> ? Replace diagonal parking along south side of 4th Street with <br /> parallel parking <br /> ? Widen sidewalk 8 feet <br /> 4th Street Station at Main Street <br /> <br /> Streetcar 2 - Santa Ana Blvd./5th Street with Civic Center Loop <br /> <br /> How Will the Preferred Alternative Be Selected? <br /> ? Accessibility and Livability <br /> ? Economic Development, Transit Supportive Land Uses and <br /> Community Goals <br /> ? Environmental Responsibility and Sustainability <br /> ? Travel Benefits, Choice, and Reliability <br /> ? Cost Effectiveness and Financial Feasibility <br /> <br /> Next Steps <br /> Summer 2010 -Spring 2011 Detailed Evaluation of Reduced Set of <br /> Alternatives <br /> Summer 2011 Draft Environmental Document <br /> Spring 2012 Final Engineering Complete <br /> July 2013 Construction Start <br /> 2015 Phase1 (SARTC to Bristol) Opening <br /> <br /> CITY COUNCIL MINUTES 20 OCTOBER 18, 2010 <br /> <br /> 1 OA-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.