My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19G - FIRST ST BRIDGE REPLACEMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
11/15/2010
>
19G - FIRST ST BRIDGE REPLACEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:57:44 PM
Creation date
11/10/2010 2:06:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
19G
Date
11/15/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> 10. Consult with the City when the contractor requests interpretations of the meaning and <br /> intent of the drawings and specifications, and assist in achieving the resolution of <br /> problems which may arise. <br /> <br /> 11. Process all shop drawings, project data, samples and other submittals received from <br /> the contractor; coordinate them with information contained in related documents, and <br /> transmit to the design engineer for review and approval. <br /> 12. Record the progress of the project. Submit written daily and progress reports to the <br /> City. Keeps a daily log containing a record of weather, contractor's work on the site, <br /> number of workers, work accomplished, problems encountered, and other relevant <br /> data. Make the log available to the City. Prepare and send Weekly Statement of <br /> Working Days to the contractor. Check certified payrolls. Monitor contractor's <br /> compliance with labor code requirements. <br /> <br /> 13. Maintain (at the job site) records of contract documents including drawings, addenda, <br /> change orders, and other modifications of plans and specifications marked to show all <br /> changes made during construction. Maintain as-built records of underground utilities, <br /> including locations and depths of trenches. At the completion of the project, deliver to <br /> the City all contract documents including as-built records. <br /> <br /> 14. Evaluate the completion of the work of the contractor and make recommendations to the <br /> City when work is ready for final inspection. Assist the City in conducting final <br /> inspections. Secure and transmit to the City required guarantees, affidavits, leases, <br /> operations manuals and other documents stipulated to be submitted by the contractor. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Exhibit 1 <br /> 19G-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.