My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-13-2004
Clerk
>
Minutes
>
Planning Commission
>
2004
>
12-13-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:57:48 PM
Creation date
11/16/2010 4:38:48 PM
Metadata
Fields
Template:
PBA
Doc Type
Minutes
Date
12/13/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
continue and that the plans would need to move from their current conceptual <br />status to schematic and, ultimately, construction-level detail. <br />Commissioner Leo commented on pedestrian-linkage with accessibility across <br />the street, and inquired about marker plans for the entryway into the City. <br />Cory Alder of Nexus Development commented that they are still updating <br />renderings and will continue to work to get requested changes into plan form. He <br />indicated that the "piazza"/parking lot design is still being refined and that he is <br />investigating the use of adjacent parking structures in order to provide adequate <br />parking supply should the "piazza"/parking lot be programmed for special events, <br />such as a Farmer's Market. <br />Commissioner De La Torre recommended review of Mr. Kaliski's analysis of the <br />project elements in detail. He inquired about the community outreach efforts. <br />Mr. Alder confirmed that a meeting with the Sandpointe Neighborhood occurred <br />and several items were discussed (wall, church, drop-off areas and easements, <br />traffic mitigations, parking, and underground utilities). <br />Commissioner Cribb commented that plans should indicate the locations of any <br />water elements that will be constructed as part of the project and that these <br />elements be emphasized and, where appropriate, used to mask exterior noise. <br />Vice Chair Leo requested that staff provide the Commission with a better <br />understanding of how this city gateway will look with the construction of the <br />Nexus and Mola projects. <br />Chairman Mondo discussed a list of issues requiring review with the developer <br />and staff for implementation to the project plan. <br />H. Recess to Council Chambers (6:34 p.m.) <br /> <br />Planning Commission Minutes 4 December 13, 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.