Laserfiche WebLink
2010 - Existing Condition Analysis <br />KOA will not conduct additional traffic counts. The 2010 existing conditions will be represented by the <br />old counts based on the understanding that the 2010 counts are less than the old counts due to the <br />economic meltdown. The old counts should represent more conservative conditions. Sample <br />comparison table and explanation with why we are not recounting and recalculating all intersections will <br />be included in the updated report. The City will provide traffic counts conducted in October 2009 for <br />KOA to conduct the comparison analysis. <br />2012 - Project Built Out Condition Analysis <br />KOA will contact the City to obtain the updated the cumulative project lists and update the analysis <br />accordingly, <br />2035 - General Plan Build Out Condition Analysis <br />KOA will use OCTAM 3.3 model to generate 2035 volumes. Post processing will be performed in <br />order to obtain a set of 2035 volume data for operational analysis. KOA has recently completed <br />another study in City of Santa Ana, however, the study area is not within the close proximity of this <br />project. <br />Revise Cut-Through Traffic <br />The revision will be based on the analysis scenarios indicated in Task I through Task 3. <br />It is assumed that the Traffic Impact Study will be reviewed by the City only, and require no more than <br />one revision based on City input. <br />Task 4 - Hazardous Materials Records Search <br />The EIR, as prepared by URS to date, incorporates the results of a Phase I Environmental Site <br />Assessment (ESA) prepared in 2007 (as contracted directly from Empire Homes to LandAnierica <br />Assessment Corporation). Given the date of the above-reference Phase I ESA, URS will conduct an <br />updated regulatory database search (e.g., Environmental Data Resources, Inc.) to identify any potential <br />hazardous waste and materials concerns that were not otherwise identified in that 2007 Phase I ESA. The <br />EIR will be updated to state that a subsequent regulatory database search was performed to supplement <br />the initial Phase I ESA. <br />This proposal does not include preparation of an updated Phase I ESA, or level of reporting or <br />investigation not otherwise described herein. <br />Task 5 -Update Draft EIR for Public Circul <br />This task involves updating the pertinent sections of the Draft EIR to account for the updated technical <br />studies as described herein (i.e., traffic, hazardous waste, and air quality). It is assumed that the updated <br />EIR will be reviewed by the City no more than once prior to public circulation. <br />Task 6 - Prepare Notice of Completion and Circulate Draft EIR <br />URS will prepare the Notice of Completion for the City's transmittal to the State Clearinghouse and <br />County Clerk's Office. It is assumed that the City will update the Draft EIR distribution mailing list that <br />was previously compiled (by the City) as part of URS' original contract. It too is assumed that the project <br />proponent and/or City.will mail copies of the Draft EIR to those individuals and agencies to whom it <br />25A-12