My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - ENVIRONMENTAL SERVICES URS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
12/06/2010
>
25A - ENVIRONMENTAL SERVICES URS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:56:51 PM
Creation date
12/2/2010 1:05:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25A
Date
12/6/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional Assumptions: <br />• The project description and details remain as reflected in the Draft EIR that has been <br />prepared by URS, If the project description changes, URS reserves the right to assess <br />those changes and adjust its scope of work and fee proposal accordingly for <br />reconsideration by the City. <br />• Except as noted otherwise herein, none of the technical studies and analyses already <br />approved by the City [e.g., Cultural Study Report (Discovery Works, Inc. September <br />2008), etc,] for this project will need to be updated for inclusion in the EIR. <br />• This proposal assumes, as stated in Task 7, that one staff member (e.g., Beth Padon) from <br />Discovery Works, Inc. will attend the public meeting on the Draft EIR; this would not <br />include an architectural historian (e.g., Foothill Resources Ltd,, subconsultant to <br />Discovery Works, Inc.). <br />• The proposal does not include efforts associated with obtaining any permits. <br />This proposal does not include any project-required filing fees. <br />Project Schedule <br />With regards to project schedule, and for the purposes of this proposal as noted above, it is <br />assumed that the project duration will be 8 months. Once notice to proceed is received from the <br />City, USR will coordinate with the City to develop a detailed schedule identifying key milestone <br />dates. <br />Cost Estimate <br />The time-and-materials cost estimate to perform the work described herein is $48,335.00. <br />Attachment A includes the detailed fee estimate. <br />Should you have any questions regarding this proposal, please call me at (714) 835-6886. <br />Sincerely, <br />URS CORPORATION <br />P 'ec anags <br />Attachment A - Fee Proposal <br />Vice President <br />25A-14
The URL can be used to link to this page
Your browser does not support the video tag.