My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALBERT GROVER & ASSOCIATES -2010
Clerk
>
Contracts / Agreements
>
A
>
ALBERT GROVER & ASSOCIATES -2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2014 11:00:44 AM
Creation date
12/20/2010 10:14:54 AM
Metadata
Fields
Template:
Contracts
Company Name
ALBERT GROVER & ASSOCIATES
Contract #
A-2010-217
Agency
PUBLIC WORKS
Council Approval Date
11/15/2010
Expiration Date
6/30/2011
Insurance Exp Date
7/1/2012
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Citywide Engineering & Traffic Survey Project Schedule /insurance /Non - Discrimination <br />PROJECT SCHEDULE <br />The project schedule, as shown in Figure 2, has been prepared considering all the <br />requirements for the study detailed in the RFP in estimating the time required to complete <br />the project. AGA has adequate staff resources to provide a Draft Report to the City of <br />Santa Ana within twelve weeks from the date of notification to proceed, and a Final <br />Report to the City within two weeks of receipt of comments on the Draft Report. Given <br />the recently adopted changes in the California Vehicle Code relative to raising or <br />lowering speed limits, and the potential for controversy relative to speed limit <br />modifications resulting in the need for multiple presentations at the Commission/Council <br />level, our expedited Project Schedule will allow adequate time for these presentations and <br />ensure that the required five year maximum between speed surveys will not lapse. The <br />principal contact for this project for AGA will be Mark H. Miller, P.E., Project Manager. <br />Mr. Miller will coordinate with the City prior to data collection to ensure that no planned <br />construction work or other events will potentially impact the scheduled data collection. <br />INSURANCE <br />Appendix F contains AGA's current Certificate of Insurance, including coverage for <br />General Liability, Automobile Liability, Excess Liability, Worker's Compensation and <br />Professional Liability. Limits are as shown, and all limits are at least $1 million. <br />NON- DISCRIMINATION <br />The required "Certificate of Non - Discrimination by Consultant" is included in Appendix G. <br />ProposWManta Ana \Speed Survey 2010 \2010 Speed Survey Pro.doc <br />Albert Grover & Associates 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.