My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-52
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2000
>
2000-52
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:56:27 PM
Creation date
12/30/2010 1:53:24 PM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Doc #
CUP00-26
Date
11/27/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO.00-52 <br />NOVEMBER 27, 2000 <br />PAGE 2 OF 8 <br />7. Covenants, Conditions, and Restrictions (CC&R's) that restrict <br />truck delivery hours to non-peak periods need to be submitted <br />prior to building plan check. <br />8. The project must comply with the mitigation measures <br />identified in Final Environmental Impact Report No. 87-1. <br />These mitigation measures include: <br />• <br />a. Outdoor lighting shall be designed and installed so that <br />all direct rays are confined to the site and adjacent <br />properties are protected from glare. <br />b. Grading plans for the proposed project shall reflect <br />that during demolishing, earthwork, and hauling <br />activities, the contractor shall control fugitive dust <br />emissions by regular watering or other dust-preventive <br />measures to the extent feasible to comply with SCAQMD <br />Rule 403. <br />c. All material excavated or graded will be sufficiently <br />watered to prevent excessive amounts of dust. Watering <br />with complete coverage shall occur at least twice daily, <br />once in the late morning and once after work is done for <br />the day. <br />d. All clearing and earthwork activities shall cease during <br />period of high winds (winds greater than 25 mph averaged <br />over one hour) or during Stage 1 or Stage 2 smog <br />episodes. <br />e. Streets surrounding the project site should be cleaned <br />at the end of each day of construction. <br />f. All material transported <br />sufficiently watered or <br />excessive amounts of dust. <br />offsite shall either be <br />securely covered to prevent <br />g. The amount of area disturbed by clearing and earthwork <br />activities shall be minimized at all times. <br />• h. Equipment engines shall be maintained in good condition <br />and in proper tune according to manufacturer's <br />specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.