■ AECOM 16 <br />Schedule, Project Management Plans <br />and QA /QC <br />Project Management Plan <br />Project manager as single point of contact <br />The AECOM team's project manager, Mr. James Faber, will <br />serve as our single point of contact for the City of Santa Ana <br />and will be proactive in the processing of the project through <br />Caltrans. In this capacity he will be responsible for: <br />• Delivering the project scope of work and meeting the <br />project schedule and budget <br />• Serving as primary contact with the City and other <br />agencies, as required, to meet project needs <br />• Managing the AECOM team, including the authority to <br />make decisions on behalf of the team and to commit <br />corporate resources to meet project requirements <br />• Scheduling and internally coordinating the team's work <br />• Ensuring that the project's technical /professional and <br />contractual requirements are thoroughly fulfilled <br />• Establishing clear lines of communication both <br />internally and externally <br />• Chairing all regular project team meetings and being <br />the primary respondent to the City <br />• Initiating and maintaining a quality management <br />program tailored to the project <br />An effective communications process <br />The effectiveness of our communication with the City <br />of Santa Ana and all project participants is crucial to a <br />successful project. Mr. Faber is dedicated to fostering a <br />productive communication process and to providing proactive <br />design issue resolution, working with the City as an extension <br />of staff. <br />Proactive approach to comment resolution <br />AECOM takes a very proactive stance in addressing issues <br />and comments as they arise. This eliminates the need <br />for rehashing previous issues or multi -cycle reviews and <br />responses at each submittal milestone, thus allowing a fast - <br />tracked project delivery. There are several components in <br />achieving this: <br />• Develop an action list, each uniquely numbered, from <br />each meeting, tracking them through resolution <br />• Conduct workshop meetings with Caltrans and other <br />stakeholders prior to submittal milestones to review <br />the product and receive feedback, as well as allow <br />Caltrans and the other stakeholders to familiarize <br />themselves with the submittal package <br />• Develop a comment response matrix to track <br />comments through to closeout <br />• Meet as necessary to ensure agreement on comment <br />resolution prior to submittal <br />QA /QC <br />Project - specific Quality Control Plan <br />Quality is essential on all cm <br />engineering projects. AECOM is ISO AH "a`ewf`°TIFIMAimfneNefrzer� °tls <br />CERTIFICATE <br />9001:2000 certified and employs ° °n1CN-1 r,$4° <br />,�f�ysya,rntl,. <br />AECOM USA, Inc. (f.k.aa. DMJM HARRIS & CTE) <br />a quality management system as <br />shown below in Figure b. This KrtlAaAMT{ 901ryA°PA,yz <br />�� xsosann "e..aasre.f .tl�PA,4, <br />SOVT!+EAB. wtl�WW 5 "A fl Ar?Surm3W W L J },gyp <br />program incorporates quality review.r <br />Tz Z_.� <br />rz,. mo�yA� <br />at each working level from the KgtlrzTaK _ _ Rtl <br />MrGriE54 4hkma ]44 E' ccM.' G 48{aof <br />project manager down and from the �. <br />w :rc.. azaAme. w.n xx *xaa <br />fetlmnxa�rstl. mesa use rammae,awu,e aaeara. w,.a� sua <br />discipline level up, and is continually K 0012 000 g arcgreaaaatlaatlea4,am <br />reinforced during the project. m9 tlmaem <br />Tne certrKa i emo tlnr as ma, <br />rnn cerzirKaf /7wa as a reer y e, xoas <br />�C �ks )fCe. M as aaaz <br />There are four components to this ®R''�a�tlary <br />Tne me1tlW of opennon br GUNny i<Nficalion deM1neq in ltle KEMA General Perm, And <br />approach. They address all aspects <br />KEMARagiaueretl Ouslkg,lnc. Aecretlnetl By'. <br />of the project and are performed hh Ql° �a°1 °a° "Ae <br />� PA 165f4 <br />Fm:_(215jBBi3B04 <br />continually and at major milestones <br />during project development. They include: <br />Engineering discipline review During the project, prior to any <br />formal submittal, the design and reports are reviewed by the <br />discipline managers. <br />Coordination review. The project manager and discipline <br />lead engineers will review the construction documents <br />for coordination, accuracy, client drafting standards, and <br />definition of work. <br />Constructibility review. Following review by the lead <br />engineers, the QC team will coordinate an independent <br />constructibility review to verify criteria compliance, evaluate <br />the comprehensive quality of the geometric plans and design <br />plans, and resolve potential constructibility issues. <br />Quarity assurance /quality control review. QA /QC reviews <br />will be conducted on an impromptu basis and prior to each <br />milestone submittal. These will be independent reviews led by <br />the project manager with the involvement and management <br />review of the Project Director, James Faber, PE. <br />In addition, we will draw upon our own vast construction <br />management resources to review the bid documents for items <br />that may lead to potential contractor change orders at each <br />milestone submittal. <br />Planning & Engineering <br />Quality Assurance/ <br />Discipline Review <br />Coordination Review <br />Constructibility Review <br />Quality Control <br />Project Managers <br />Project Manager <br />ConstructibilityTeam <br />Independent <br />Technical Leaders <br />P <br />0 <br />QA/QC Team <br />Calculati <br />9 Checkaccuracy <br />- Consistancy iW <br />, Completeness. <br />& accuracy <br />• Formal Review <br />Dimensi <br />• Design Theo <br />between disciplines <br />- Constructibi ty <br />. Documentation <br />• Detailed approvals <br />• Physical interference <br />Errors & omissions <br />. Change order <br />potential <br />Claims potential <br />Figure 8 <br />II� <br />e 4tl 000 <br />®® Proposal for Project Study Report Equivalent and Conceptual Engineering Plans for <br />Santa Ana Boulevard Grade Separation Project <br />