My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - SANTA ANA BLVD GRADE SEPARATION_Exhibit A-1_Color
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
01/18/2011
>
25B - SANTA ANA BLVD GRADE SEPARATION_Exhibit A-1_Color
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 2:44:35 PM
Creation date
1/3/2011 11:41:16 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25G
Date
1/4/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ AECOM <br />Scheduk <br />AECOM has developed the schedule shown in Figure 9 <br />based upon past experience on similar projects. We have <br />demonstrated our ability to deliver planning documents on <br />grade separations, from Feasibility Studies and PSRE's to <br />full Project Report /Environmental Documents. Within the <br />last 12 months, AECOM has worked on the following grade <br />separation planning documents: <br />• Raymond Avenue <br />• Orangethorpe Avenue <br />• Baldwin Park Avenue <br />• Puente Avenue <br />• Jurupa Avenue <br />• McKinley Street <br />• Streeter Avenue <br />Our experience also helps us understand the critical <br />elements which need to be address to ensure the project <br />schedule is met, and these include: <br />Third Party Coordination — Actively engaging third parties, <br />from the railroads to the utility companies, from day one <br />of the project is essential. Maintaining the open line of <br />communication and flow of information is crucial to timely <br />responses, direction and approval. Early agreement on design <br />parameters, such as vertical clearances for the railroad, as <br />well as relocation alternatives for utilities, will help pave the <br />path for approvals. <br />is <br />Environmental — Engaging the environmental planners <br />during the initial alignment studies will be critical to ensuring <br />that the all components are adequately covered in the PES <br />or PEAR, which will facilitate approvals through the City for <br />CEQA and Caltrans for NEPA. <br />Response Procedures — AECOM takes a very proactive <br />stance in addressing issues and comments as they arise. <br />This eliminates need for rehashing of previous issues <br />or multi -cycle reviews and responses at each submittal <br />milestone. There are several components in achieving this: <br />1. Develop and action list, each uniquely numbered, to <br />track them from inception to closure. <br />2. Conduct workshop meetings with stakeholders prior to <br />submittals to review the product and receive feedback. <br />3. Develop a comment response matrix to track comments <br />through to closeout. <br />AECOM is confident that in our approach to this project, along <br />with our relationships with the City, SCRRA, OCTA, Caltrans, <br />and the utility companies, we will meet the schedule as <br />shown. <br />ID <br />Task Name <br />Duration <br />M -1 M1 M2 M3 M4 M5 M6 M7 M8 <br />1 <br />NTP <br />0 days <br />2 <br />Phase I- PSR and PES or PEAR <br />175 days <br />3 <br />Project Management/Coordination <br />170 days <br />4 <br />Project Study Report <br />175 days <br />5 <br />Research & Data Collection <br />5 days <br />6 <br />Obtain ROE from SCRRA <br />30 days <br />7 <br />Prepare /Obtain Approval Traffic Control Plan <br />15 days <br />8 <br />Utility Identification <br />50 days <br />9 <br />Topo /Base /Field Work/Design Surveys <br />20 days <br />10 <br />Prepare Alternatives Concepts (3 Min.) <br />50 days <br />11 <br />Prepare Traffic Analysis and TMP for Alts. <br />30 days <br />12 <br />Geotechnical Recommendations <br />30 days <br />13 <br />Structural APS's <br />30 days <br />14 <br />Hydraulics and Hydrology Study <br />30 days <br />15 <br />Right -of -Way Identification <br />10 days <br />16 <br />Cost Estimates <br />20 days <br />17 <br />Structural Type Selection <br />20 days <br />18 <br />Conceptual Engineering Plans for Alts. <br />20 days <br />19 <br />Draft Project Study Report Equivalent <br />30 days <br />20 <br />Submit Draft PSRE to City <br />0 days <br />21 <br />City Review Draft PSRE <br />15 days <br />22 <br />Final PSRE <br />10 days <br />23 <br />City Review /Approve Final PSRE <br />15 days <br />24 <br />Environmental PES or PEAR <br />40 days <br />25 <br />Environmental PES or PEAR <br />40 days <br />Figure 9 - Proposed Schedule <br />II� <br />e 4tl 000 <br />®® <br />Proposal for Project Study Report Equivalent and Conceptual Engineering Plans for <br />Santa Ana Boulevard Grade Separation Project <br />