■ AECOM
<br />Albert Pan, PE
<br />Utilities
<br />Education and Reeistrations
<br />BS /1998 /Civil Engineering
<br />MS /2002 /Construction Management
<br />PE /2009 /California, No: 74856
<br />Albert has more than five years of roadway design experience and three years of
<br />claims and scheduling experience in California. He has qualified experience in the
<br />local agency and Caltrans project delivery process, and has extensive knowledge of
<br />the Primavera (P3) scheduling system.
<br />Glen Helen Parkway Grade Separation over UPRR +BNSF, San Bernardino,
<br />California Project engineer responsible for horizontal and vertical geometric
<br />design on the proposed alignment, proposed grading, right of way engineering,
<br />temporary traffic controls during construction, coordination between our sub
<br />consultants, the County, and utility companies, and project plan delivery.
<br />Auto Center Drive Grade Separation over BNSF, Corona, California Project
<br />engineer responsible for horizontal and vertical geometric design on the proposed
<br />alignment, proposed grading, right of way engineering, value engineering,
<br />retaining wall design, temporary traffic controls during construction, coordination
<br />between our sub consultants, the City, and utility companies, and project plan
<br />delivery.
<br />i�ogates Street Grade Separation over UPRR, West Covina, California: As a
<br />Scheduler, Albert was responsible for review of monthly schedule updates and
<br />time impact analysis in direct response to claims by the contractor and for future
<br />claims.Grade separation of the UPRR Alhambra Branch crossing at Nogales
<br />Street. The major components of work consist of a UPRR grade separation bridge,
<br />an overcrossing at Valley Boulevard, retaining walls, depressing Nogales Street, a
<br />loop connector road, utility relocations, a pump station, detour roads, landscaping
<br />and irrigation, drainage & sewer, and signalization & lighting and other
<br />miscellaneous items of work. Avenue S Grade Separation and Avenue Corridor
<br />Improvements, Palmdale, CA: Senior scheduler responsible for review of monthly
<br />schedule updates and time impact analysis. In addition, Albert reviewed the
<br />baseline for approval and acceptance by the resident engineer. AECOM provided
<br />full construction management, engineering and inspection services for the City
<br />of Palmdale's Avenue S grade separation and Avenue S corridor improvement
<br />projects. These projects included the widening of Avenue S, construction of a
<br />bikeway, bridge replacement, and traffic signal installations & upgrades.
<br />Ramona Boulevard Grade Separation over UPRR +Metrolink, cl Monte, California:
<br />As a Scheduler, Albert was responsible for review of monthly schedule updates
<br />and time impact analysis in direct response to claims by the contractor and for
<br />future claims. Grade separation at the UPRR and Metrolink crossings of Ramona
<br />Boulevard. Ramona Boulevard was lowered to cross under the two existing tracks,
<br />as well as to accommodate the construction of a future third track. The project
<br />consists of the construction of two railroad bridge structures and a substructure
<br />for a future bridge to the north. Also, a temporary shoofly track for both Metrolink
<br />and UPRR, a pump station and various retaining walls, a water line and several
<br />storm drain lines.
<br />Dillon Road Grade Separation over UPRR, Coachella, California: Project engineer
<br />responsible for construction support, final right of way engineering and preparing
<br />as -built plans. The structure is a two -span, 296 foot long, 62 foot wide cast -
<br />in -place /prestressed box girder bridge supported on high cantilver seat type
<br />abutments and a three - column bent.
<br />McKinley St. Grade Separation over BNSF, Corona, California: Project engineer
<br />responsible for horizontal and vertical geometric design, cost estimates, value
<br />engineering between alternatives, and coordination between sub consultants, the
<br />City, and utility companies.
<br />II�
<br />e 4tl 000
<br />®®
<br />Proposal for Project Study Report Equivalent and Conceptual Engineering Plans for
<br />Santa Ana Boulevard Grade Separation Project
<br />
|