Laserfiche WebLink
1. Sewer /waste water (Santa Ana PWA) <br />2. Water /water well replacement (Santa Ana PWA) <br />3. Solid waste /refuse (Santa Ana PWA) <br />4. Fire service /paramedics /fire alarm system (Santa Ana FD) <br />5. Police services (Santa Ana PD) <br />6. Recreational Facilities (Santa Ana Parks, Recreation &Community <br />Services Agency) <br />7. Street and site drainage (Santa Ana PWA) <br />8. Electricity (Southern California Edison) <br />9. Natural gas (Southern California Gas Company) <br />10. Communication services (AT &T) <br />11. Cable T.V. (Time Warner) <br />12. Bus Services (OCTA) <br />As part of this survey, the Consultant shall include both a field review as well <br />as a review of available as -built drawings, encroachment permits, and utility <br />franchise agreements for the projects areas. The results of this review shall <br />be a database of utility records indicating type of utility, owner, drawing <br />number, and other relevant information. Consultant shall also prepare a utility <br />base map of the PROJECT area showing locations of all existing utilities. <br />Deliverables - Utility Database and Base Map. <br />E. Field Survey /Topography <br />The Consultant shall perform all surveys and aerial mapping necessary to <br />complete the requested scope of services. The Consultant shall prepare an <br />aerial topographic survey map at a scale of 1" = 20' of the PROJECT site and <br />surrounding area to provide all necessary information for horizontal and <br />vertical controls. Survey of the PROJECT site shall be prepared in US <br />Customary English units by a California licensed Land Surveyor in <br />Microstation V8 format. The horizontal datum shall be NAD 83 and the <br />vertical datum shall be NAVD 88. Survey shall be done to cover at least 100 <br />feet beyond the PROJECT's ultimate right -of -way and shall include locating <br />building foot prints, utilities, trees, sidewalks, fences, poles, meters, vaults, <br />structures, street furniture, curb and gutters, etc. <br />Deliverables — All electronic files and field notes for field survey /topography <br />data collection. <br />F. Traffic Studies <br />The Consultant shall perform the traffic analysis in accordance to the PSRE <br />development. The analysis shall support the preparation of the traffic impact <br />section of the required environmental evaluation documents. The Consultant <br />shall analyze travel- demand model and prepare future traffic projections for <br />0 <br />