My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - ENGINEERING SRVS GRADE SEPARATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
01/04/2011
>
25G - ENGINEERING SRVS GRADE SEPARATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:55:46 PM
Creation date
1/4/2011 7:05:54 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25G
Date
1/4/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> II ~ . II <br /> <br /> <br /> Mr. Erney is the transportation engineering department manager and a senior proj- <br /> ect manager for the AECOM Los Angeles office. He has successfully managed over <br /> Traffic Studies/TMP 100 transportation planning and engineering projects throughout California. He is <br /> IIIIIIIII~' III Iii- iillll III~~'~ °ii ~~ill '°'iii iil II a certified professional planner with experience managing analyses and documen- <br /> tation for environmental review projects, access and circulation studies, sustain- <br /> MS/1997/Transportation Engineering able transportation practices,TDM measures, parking evaluations, pedestrian and <br /> MCP/1997/City and Regional Planning bicycle reviews, and data collection programs. Other experience includes detailed <br /> BS/1995/Mechanical Engineering technical analysis of local and regional roadway facilities, including traffic fore- <br /> AICP/2000/United States, Registration casting, modal split analyses, traffic diversion, and operational analyses. He has <br /> No: 015998 experience coordinating with local and regional transportation and environmental <br /> Professional Transportation Planner agencies in Southern California. <br /> ~ i I <br /> Led the initial planning efforts for the proposed Nogales <br /> Street grade separation (Los Angeles subdivision), including preparing estimates <br /> of future traffic volumes in the area, estimating the effects of the proposed grade <br /> separation on traffic volumes, and evaluating the potential impacts to queues and <br /> intersection operating conditions. Provided analysis on proposed bypass road <br /> with reduced number of lanes to determine the impact on surrounding streets, <br /> intersections, and interchanges. Developed mitigation measures to ensure <br /> adequate level of service during the construction period. <br /> <br /> ~ ~ ~ i ~ o 0 o a <br /> i. ~ ~ ly ~ ~ iii". <br /> Led the analysis assessments task for the review of possible grade separation <br /> options for Temple Avenue and Baldwin Park Boulevard in the City of Industry. For <br /> each location, reviewed the traffic impacts of various roadway configurations and <br /> possible reconfiguration ofthe northbound and southbound I-605 on-ramps and <br /> off-ramps. <br /> III ~ I i I i ~ I I I <br /> Tim led the transportation evaluation for the proposed new grade separation for <br /> the intersection of Puente Avenue and Valley Boulevard in the City of Industry, <br /> CA. For this assessment, projected the future background traffic volumes <br /> and estimated the vehicles that would be affected by the grade separation. To <br /> support the development of the preferred project alternative, conducted multiple <br /> intersection level of service and queuing analyses used to rank the effectiveness <br /> and secondary effects of each proposed alignment. <br /> ~ i <br /> <br /> I II . ° Performed a peer review of the grade separation evaluation <br /> and transportation section of the environmental impact report for this proposed <br /> new transit line from downtown Los Angeles to Santa Monica. Using the Metro <br /> Grade Crossing policy, assisted in the determination of whether crossings needed <br /> to be grade separated (considering upstream and downstream queues and <br /> intersection levels of service). In addition, conducted a detailed review of the <br /> preliminary draft and draft EIR sections with regards to all traffic, transit, parking, <br /> pedestrian, and safety evaluations. <br /> n'inr, ~~mw ir. mme ~ ~~mw ~~~~~u i m, i i ; <br /> I I II' I u <br /> I I .I . I ~ Prepared documentation for the reconstruction <br /> <br /> of the US 101 overcrossing in conjunction with the Third Street Light Rail project <br /> in San Francisco. As part of this effort, investigated the level of service conditions, <br /> accident data, and freeway mainline and ramp volumes for future conditions, both <br /> with and without the proposed changes. Based on the results of the assessment, <br /> recommended revised intersection signalization,signing and striping, and <br /> geometrics to minimize impacts to the freeway and adjacent streets. <br /> a <br /> <br /> i , <br /> <br /> II ~ ~ II „ ~ W ~ I ' ~ III II I I <br /> <br /> ir~ ~ ~ . <br />
The URL can be used to link to this page
Your browser does not support the video tag.