Laserfiche WebLink
<br /> <br /> <br /> AGREEMENT FOR PROVISION OF <br /> PROFESSIONAL ENGINEERING SERVICES <br /> <br /> THIS AGREEMENT, made and entered into this 4th day of January, 2011 by and between <br /> AECOM, a California corporation (hereinafter "Consultant"), and the City of Santa Ana, a charter city <br /> and municipal corporation organized and existing under the Constitution and laws of the State of <br /> California (hereinafter "City"). <br /> RECITALS <br /> A. The City desires to retain a consultant having special skill and knowledge in the field of <br /> engineering to prepare a Project Study Report Equivalent and Conceptual Engineering Plans for <br /> the Santa Ana Boulevard Grade Separation Project. <br /> B. Consultant represents that Consultant is able and willing to provide such services to the City. <br /> C. The project will be funded in part through funds administered by the Federal Highway <br /> Administration and Caltrans retains oversight over the project. <br /> D. In undertaking the performance of this Agreement, Consultant represents that it is <br /> knowledgeable in its field and that any services performed by Consultant under this Agreement <br /> will be performed in compliance with such standards as may reasonably be expected from a <br /> professional consulting firm in the field. <br /> NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms <br /> and conditions hereinafter set forth, the parties agree as follows: <br /> 1. SCOPE OF SERVICES <br /> Consultant shall provide professional and technical engineering services necessary to investigate <br /> alignment alternatives, prepare a Project Study Report Equivalent (PSRE) for the Santa Ana Grade <br /> Separation Project, as set forth in City's Request for Proposal, attached hereto as Exhibit A, as further <br /> detailed in Consultant's Proposal dated April 6, 2010, attached hereto as Exhibit A-1 and revised Scope of <br /> Services and Fee Schedule submitted on December 20, 2010, attached hereto as Exhibit A-2. Exhibit A, <br /> A-I and A-2 are incorporated by reference. <br /> a. Scope of Work. The PSRE shall include preliminary environmental studies either PEAR <br /> or PES as determined by the guidelines., cost estimates for construction and right-of-way, conceptual <br /> engineering plans, evaluation of alternative alignment impacts, including right-of-way and traffic detour <br /> routes during construction. The PSRE shall include 1) Project Management 2) research and data <br /> collection; 3) aerial mapping and field survey; 4) utility survey 5) design and alignment alternatives <br /> analysis and development of preferred alternative features and standards; 6) traffic analysis and traffic <br /> management plan ; 7) structural analysis; 8) hydraulics and hydrology study; 9) site constraints analysis; <br /> 10) conceptual engineering plans; 1 1) right-of-way requirements; and 12) preliminary cost estimates and <br /> project schedule Consultant shall also provide an environmental assessment including the preparation <br /> of necessary studies and reports, holding the required public hearings, and submittal of documentation to <br /> the necessary governing bodies. <br /> 1 <br /> 25G-3 <br />