My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - ENGINEERING SRVS GRADE SEPARATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
01/04/2011
>
25G - ENGINEERING SRVS GRADE SEPARATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:55:46 PM
Creation date
1/4/2011 7:05:54 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25G
Date
1/4/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> ~~II~~'~'~'~'~'~~~~° II <br /> <br /> <br /> <br /> Mr. Faber is a registered civil engineer with extensive experience in highway, bridge, <br /> Project Manager and railroad design, construction management, and project management. This ex- <br /> perienceincludes working in the road design section of Caltrans District 12. He is <br /> IIIIIIIIIII; : II II Iii ~ ii~ III~~~. <br /> ~°1~'°~° proficient in the management of large scale, multi-discipline projects, and the de- <br /> BS/1984/Civil Engineering velopment of construction documents for both rail and highway projects. Mr. Faber <br /> PE/1990/California, No:45668 is proficient in MicroStation, INRAIL, and project management software (including <br /> Microsoft Project). <br /> III' <br /> <br /> ~ ~ II ~ m m _ ~ II <br /> Chris <br /> Saed ~ Project manager. Responsible for managing the preliminary <br /> I <br /> San Bernardino County engineering for the project report (PR) and environmental document (ED) for the <br /> 909.387.7877 Glen Helen Parkway grade separation over both Union Pacific (UP) and Burlington <br /> Northern Santa Fe (BNSF) railroad tracks. Project tasks include development <br /> Linda Bazmi of realignment alternatives, bridge alternatives, evaluation of impacts to <br /> City of Corona utilities and adjacent properties, developing engineering cost estimates, and <br /> 951.739.4960 assessing right-of-way impacts. The project tasks include development of <br /> realignment alternatives, bridge alternatives, evaluation of impacts to utilities <br /> Mike Livingston and adjacent properties, developing engineering cost estimates, and assessing <br /> City of Palmdale right-of-way impacts. Several major utility lines cross Glen Helen Parkway and <br /> 661.267.5300 accommodations or relocations of utilities need to be made to construct the <br /> proposed improvements. <br /> II' I I "~°~ii~r~~~' Project director. <br /> Responsible for construction of the grade separation bridge structure for Iowa <br /> Avenue over the BNSF triple tracks. The project will entail the project approval, <br /> the environmental document, for both NEPA and CEQA clearance, and the <br /> production of the ultimate PS&E construction documents. The structure is a <br /> 3-span, 454-ft long,102-ft wide CIP/PS box girder bridge supported on high <br /> cantilever seat type abutments and 6-column bents. Both abutments and bents <br /> are supported on driven steel piles. <br /> w I I ~ ~ , lu~~~~~~: Project manager <br /> responsible for the organization of the preliminary engineering on the project <br /> report and the environmental document for the grade separation of BNSF's <br /> main line tracks at 3rd Street. The grade separation involves three BNSF tracks, <br /> a potential future Metrolink track, and a nearby set of UPRR tracks. The City <br /> of Riverside contracted AECOM as prime consultant to provide preliminary <br /> engineering for a project report and environmental document for the great <br /> separation of BNSF's main line tracks at 3rd Street. The grade separation involves <br /> three BNSF tracks, a potential future Metrolink track, and a nearby set of UPRR <br /> tracks. <br /> <br /> II II II iI .a~~~ Project manager. <br /> Responsible for the production of a project study report and a preliminary <br /> environmental analysis report. AECOM is responsible for the production of a <br /> project study report (PSR) and a preliminary environmental analysis report (PEAR) <br /> for the McKinley Street grade separation over the BNSF railroad. <br /> III"'Nn _ n'.. <br /> I ~ I _ ~ I Project <br /> manager. Responsible for administering all aspects of the project, including <br /> obtaining a PUC order to construct; developing and participating in negotiations <br /> with BNSF for construction and maintenance agreements; environmental <br /> clearance; right-of-way; surveying; utility coordination; roadway; bridge; traffic; <br /> and geotechnical reports. The Auto Center Drive overhead is a three-span cast- <br /> in-place concrete box superstructure that carries four vehicular traffic lanes and <br /> a median over the BNSF ROW. The bridge has a high skew and design features <br /> have adapted to the many utility lines present in the area. The structure is a 353-ft <br /> long, 76-ft wide CIP/PS box girder bridge supported on high cantilever seat type <br /> abutments and drilled shaft bents. <br /> a <br /> <br /> i , <br /> II ~~r ~ II x „N~~~ ~~~~~~~W ~ ~ I ' ~ III II I I <br /> gird ~ ~ ~ L ~,~~„fii~ il,,,, „ <br /> ir~ ~ ~ . <br />
The URL can be used to link to this page
Your browser does not support the video tag.