Laserfiche WebLink
• Mapping and design information from the City for improvement projects; <br />• Hazardous material/waste information; <br />• Preliminary materials (geotechnical) information; <br />• Traffic data (existing and forecasted traffic, level of service, capacity adequacy, operational analysis, <br />accidents, etc.); and <br />• Right-of-way and utility plans. <br />Task 1.3 Topo/Base/Field Work/Design Surveys <br />Control Surveys <br />Horizontal and vertical corridor control will be established along the corridor to support the aerial photogrammetry, <br />land net surveys, engineering surveys and future design and construction activities along the corridor. The survey <br />control will be set in accordance with Caltrans survey standards and will be tied into the North American Datum of <br />1983 (NAD83 NSRS 2007) and the North American Vertical Datum of 1988 (NAVD88 Riverside County) or as <br />specified by the client. <br />Land Net Surveys and Mapping <br />This task entails cadastral research within Caltrans District 12 and the County of Orange for existing centerline and <br />right-of-way files and/or available cadastral records in support of the centerline and right-of-way of I-5, Santa Ana <br />Boulevard, and Lincoln Street. <br />Field surveys will be performed to locate the centerline. In addition, key monuments will be located in order to <br />calculate the centerline of the corridor and adjacent intersecting routes. The right-of-way will be based upon record <br />calculations only and will not be surveyed. <br />A land net base map will be prepared at a scale comparable to the aerial mapping and will include said record <br />centerlines and rights-of-way as well as underlying cadastral information, ownership information as recorded with the <br />Riverside County assessor's office. All these data will be incorporated with the aerial mapping and delivered in a <br />Microstation v8 format. <br />Photogrammetric Mapping <br />The aerial mapping will be prepared in conformance with Caltrans CAD mapping standards and photogrammetric <br />specifications. Horizontal and vertical aerial control panels will be set to meet aerial triangulation requirements. The <br />mapping will be prepared to 1" = 50' scale with 1-foot contours and will be delivered in a Microstation v8 format. <br />Survey crews will field verify the aerial mapping to delineate planimetrics obstructed by tree coverage or shadows and <br />to verify the contours and spot elevations generated from the aerial mapping. <br />A color digital orthophoto with 3" pixel resolution will be prepared from the 50-scale imagery. The digital orthophoto <br />will cover the same mapping limits described above. <br />Task 1.4 Traffic Operations Analysis <br />We will prepare a traffic operations analysis for the Santa Ana Boulevard grade separation project. The traffic <br />operations analysis will examine existing and forecast future year conditions in the vicinity of the OCTA/SCRRA at- <br />grade crossing with Santa Ana Boulevard. The future year conditions examined will be the project opening year and <br />the project design year (20 years after opening, assumed to be 2035). Conditions examined will include the No Project <br />Alternative and up to three build alternatives. <br />047 of Santa Ana <br />25B-23