Laserfiche WebLink
Preliminary Environmental Study <br />After receiving a notice to proceed and preliminary layout from AECOM for the build alternative, a Caltrans <br />Preliminary Environmental Study (PES) form (November 20, 2007) will be prepared for submittal to City and Caltrans <br />for review. The purpose of the PES is to identify and receive concurrence from Caltrans regarding the technical studies <br />that will need to be prepared for the proposed project and to receive concurrence regarding the environmental <br />document to be prepared. The PES will be prepared using existing, available information and no new analyses or <br />detailed evaluations are assumed or included. As directed in the PES, cultural information will be provided entirely by <br />Caltrans. The PES will be revised twice following Caltrans review. Figures will include a vicinity map, a location <br />map, and the layout provided by AECOM. No additional figures or graphics are assumed to be necessary. <br />Deliverables: <br />• Draft, revised Draft, and Final PES. <br />Public Information Meetings <br />Although not legally required for the level of environmental document that is proposed, it is assumed that two public <br />information meetings will be conducted for the proposed project. One at the outset of the project after the build <br />alternative has been developed, and one during the PA/ED process at times to be determined by the City and Caltrans. <br />The meetings will utilize boards that present the project alternative. ICF Jones & Stokes will assist the City and <br />Caltrans in organizing and holding the informational meetings. It is assumed that the City will secure the location for <br />the public meeting. For each meeting a notice will be prepared by ICF Jones & Stokes for publication in a newspaper <br />of local circulation (Orange County Register, etc.). This notice will be submitted to the City and Caltrans for review <br />and approval. It is assumed that ICF Jones & Stokes will coordinate publication of the notice in the newspaper and that <br />the City will be responsible for paying the newspaper directly for the publication cost. It is assumed that the notice will <br />be published in one English and one Spanish language newspaper. ICF Jones & Stokes will prepare a sign-in sheet, <br />comment cards, and up to three display boards using project layouts/graphics provided by AECOM. In addition, direct <br />mailings to property owners and residents living within 500 feet of the proposed project will be distributed using a <br />mailing list generated and provided by AECOM's right-of-way consultant or the City. No other direct mailings are <br />assumed. It is assumed that ICF Jones & Stokes Project Manager along with one additional individual, if needed, will <br />attend the meetings. <br />Deliverables: <br />• Meeting Materials (up to three 30x40 boards using primarily project layouts/graphics provided by AECOM, sign in <br />sheet, and comment cards) <br />• Attendance at informational meeting by the Environmental Task Manager and one additional ICF Jones & Stokes <br />staff member, if needed <br />• Direct mailing to property owners and residents located within 500 feet of the proposed project (assumed that <br />AECOM's right-of-way consultant or the City will provide the list of owners and addresses) <br />• Preparation and publication of meeting notice once for each meeting in one English and one Spanish language <br />newspaper (assumed that City will pay the newspaper directly for the publication) <br />Technical Studies <br />All technical studies will be consistent with meeting the requirements of CEQA and NEPA, as well as those of related <br />environmental statutes and regulations. The technical studies will be prepared to cover both related statutory <br />documentation requirements and to support preparation of a joint NEPA/CEQA document required for project <br />approval. <br />Preparation of all technical analyses and reports will follow local, state, and federal environmental guidelines, primarily <br />consisting of the Caltrans Standard Environmental Reference (SER) website, Caltrans Project Development Procedures <br />Manual, local and state CEQA Guidelines, and FHWA Technical Advisory 6640.81 Guidance on Preparing and <br />Processing Environmental and Section 4(f) Documents. The formats to be used for the technical studies will follow <br />the guidance available on the Caltrans SER website as of the date that those studies are initiated. <br />Please see scope of work for each technical study for details regarding studies to be prepared <br />Crtt' of Santa Ana <br />25B-30