Laserfiche WebLink
MEMORANDUM OF UNDERSTANDING NO. C-9-0824 <br />EXHIBIT A <br />Table 1-4 summarizes the number of signalized intersections per agency along <br />the Westminster/17th Street BRT Corridor including additional intersections <br />beyond the BRT corridor limits. <br />Table 1-4 <br />Westminster/17th Street BRT Corridor <br />wumner <br />or ainanzea Intersections <br />I-er Arterial <br />Arterial: <br />No_ of <br />Signalized - <br />Intersections <br />Along BIT <br />Route <br />Additional Signalized <br />act Ops;Outs ide- <br />=' BRT Route <br />(Potentially coordinated <br />wi - `Signalized <br />Intersections Along'BRT <br />Route) <br />Totai No_ of <br />"Traffln`Signals" <br />Desired <br />Coordinated, <br />Pacific Coast Highway <br />2 <br />O <br />O <br />Channel Drive <br />1 <br />O <br />0 <br />7th Street <br />5 <br />O <br />O <br />Seal Beach Boulevard <br />4 <br />O <br />0 <br />estminster Avenue <br />29 <br />2 <br />31 <br />'Brookhurst Street <br />0 <br />3 <br />3 <br />17th Street <br />7 <br />6 <br />13 <br />Flower Street <br />2 <br />O <br />0 <br />Civic Center Drive <br />6 <br />O <br />O <br />Santa Ana Boulevard <br />1 <br />O <br />0 <br />Total <br />57 <br />11 <br />47 <br />'Signalized intersections are currently linked with Westminster Avenue/17th Street's coordinated system. <br />Note: Total intersection count = 58 <br />Overlapping intersection counts: Harbor Boulevard Corridor = 1 <br />The locations of the additional signalized intersections per arterial beyond the <br />Westminster/17th Street BRT Corridor limits is summarized in Table 4-6 at the end of <br />Section 4. <br />1.3 APPROACH TO TRAFFIC SIGNAL SYNCHRONIZATION DESIGN <br />FINALIZATION, IMPLEMENTATION, AND SUPPORT SERVICES <br />AUTHORITY shall issue one contract for TSS design finalization, <br />implementation, and support services on the three planned BRT corridors. <br />CONSULTANT shall be responsible for the activities specified in the SOW. <br />The first TSS corridor to be implemented is the Bristol/State College Boulevard <br />BRT Corridor. This corridor is approximately nineteen (19) miles in length and <br />Scope of Work 15 09/09/1 O <br />