My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0824)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0824)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 4:45:51 PM
Creation date
1/13/2011 3:55:04 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0824)
Contract #
N-2011-004
Agency
PUBLIC WORKS
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM OF UNDERSTANDING C-9-0824 <br />1. To retain oversight of the PROJECT development and establish PROJECT <br />1 milestones. <br />"a 2. To interface with the AGENCIES and coordinate outreach for the PROJECT. <br />4 3. To assist in building consensus among the AGENCIES with respect to the required <br />5 services for the PROJECT. <br />6 - 4. To collect manual or electronic intersection directional movement and automated <br />7 machine traffic counts specified in the PROJECT Scope of Work. <br />$ 5. To develop new timing plans optimized for signal synchronization, and provide <br />9 updated timing plans and turning movements to the AGENCIES in Synchro format upon request. <br />10 6. To provide on -site support to implement the timing plans as necessary. Timing plans <br />11 are subject to each AGENCY'S review and approval. <br />12 7. To prepare "before" and "after' studies of the PROJECT conditions. The "before" <br />1 studies shall be completed by spring 2011, and the "after" studies shall be completed by winter <br />14 2012. <br />15 ARTICLE 3. RESPONSIBILITIES OF AGENCIES: <br />16 AGENCIES agree to the following responsibilities for PROJECT: <br />17 1. To provide AUTHORITY all current intersection, local field master, and/or central <br />18 control system timing plans and related data no later than February 1, 2011, and updates on an as- <br />1 9. needed basis as required by AUTHORITY. <br />20 2. To provide Plans, Specifications and Estimates (PS&E) to the AUTHORITY or its <br />21 representative for its use in the construction of infrastructure as needed to implement coordinated <br />2 2 and synchronized systems and operations. <br />23 3. To give PROJECT related signal and telecommunications equipment a high <br />24 maintenance priority during the PROJECT. <br />25 4. To take reasonable steps to keep signal control systems, inter —tie, detection systems <br />26 and related equipment in proper working order during the PROJECT. <br />Page 3 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.