My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0824)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0824)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 4:45:51 PM
Creation date
1/13/2011 3:55:04 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0824)
Contract #
N-2011-004
Agency
PUBLIC WORKS
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM OF UNDERSTANDING C-9-0824 <br />1 5. To maintain and repair their own signal control systems inter —tie, detection systems <br />2 and related equipment located within each of their respective jurisdictions. <br />3 6. To provide on -site support, if needed, for timing plan changes and the construction <br />4 and/or installation of traffic control elements as specified in the PROJECT Scope of Work. <br />7. Each AGENCY's Traffic Engineer or authorized designee (which in some cases may <br />6 be the AUTHORITY) shall be authorized to make changes or adjustments to the signal timing plans, <br />7 when required. <br />8 8. To perform the changes required at central or field control locations and/or <br />9 intersection controller assemblies. When AUTHORITY is required to make such changes, <br />10 AGENCIES shall provide AUTHORITY access to all necessary equipment. <br />11 9. To designate a technical lead person to act as a liaison among the AGENCIES. <br />12 ARTICLE 4. MUTUAL RESPONSIBILITIES OF ALL PARTIES: <br />1 _ AUTHORITY and AGENCIES agrees to the following responsibilities for PROJECT: <br />14 1 . PROJECT signal synchronization efforts shall focus on those time periods specified in <br />10 the PROJECT Scope of Work. <br />16 2. To attend and participate in all joint agencies related PROJECT meetings. <br />17 3. To cooperate and coordinate with all other agencies, their staff, contractors, <br />18 consultants, and vendors in providing the services and responsibilities required under this MOU to <br />19 the extent practicable with respect to the performance of the PROJECT. <br />20 4. The owning AGENCY shall be responsible for coordinating the construction and/or <br />21 installation of traffic control elements that are not included in the PROJECT Scope of Work. <br />22 5. To work together in good faith, using reasonable efforts to resolve any unforeseen <br />23 issues and disputes arising out of the performance of this MOU. <br />24 6. This MOU may only be modified or amended upon written mutual consent of all <br />25 AGENCIES. All modifications, amendments, changes and revisions of this MOU in whole or part, <br />26. � and from time to time, shall be binding upon the AGENCIES so long as the same shall be in writing <br />Page 4 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.