My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0826)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0826)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 4:45:24 PM
Creation date
1/14/2011 8:20:49 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0826)
Contract #
N-2011-006
Agency
PUBLIC WORKS
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM OF UNDERSTANDING NO. C-9-0826 <br />EXHIBIT A <br />overall delay, and comply with the South Coast Air Quality Management District <br />(AQMD) requirements. <br />1.2 PROJECT LIMITS AND DESCRIPTION <br />1.2.1 BRISTOL/STATE COLLEGE BRT CORRIDOR <br />Optimized signal timing and synchronization shall be implemented at the <br />following roadway segments along the Bristol/State College BRT Corridor <br />including additional intersections beyond the corridor limits due to short roadway <br />segments and/or to maintain existing synchronized zones: <br />1. Bristol Street from Baker Street to the SR-22 ramps, as well as including <br />West Memory Lane to The City Drive. <br />2. The City Drive from West Memory Lane and continuing along State <br />College Boulevard to Brea Boulevard. <br />Table 1-2 summarizes the number of signalized intersections per agency along <br />the Bristol/State College BRT Corridor including additional intersections beyond <br />the BRT corridor limits. <br />Scope of Work 11 09/09/1 O <br />
The URL can be used to link to this page
Your browser does not support the video tag.