Laserfiche WebLink
MEMORANDUM OF UNDERSTANDING NO. C-9-0826 <br />EXHIBIT A <br />Table 1-4 summarizes the number of signalized intersections per agency along <br />the Westminster/17th Street BRT Corridor including additional intersections <br />beyond the BRT corridor limits. <br />Table 1-4 <br />Westminster/17th Street BRT Corridor <br />Number of Signalized Intersections Per Arterial <br />Arterial <br />No. of I <br />Additional Signalized <br />Total No. of <br />Signalized <br />Intersections Qutside <br />Traffic Signals <br />Intersections <br />BRT Route <br />'Desired to be> <br />Along BRT <br />(Potentially: Gaordlnatad <br />`Goorainated ; <br />Route <br />yr7lh SlgrtNalizesi <br />lnters4ctione.A4, BRT <br />Routh)" <br />Pacific Coast Highway <br />2 <br />O <br />O <br />Channel Drive <br />1 <br />O <br />O <br />7th Street <br />5 <br />O <br />O <br />Seal Beach Boulevard <br />4 <br />O <br />0 <br />Westminster Avenue <br />29 <br />2 <br />31 <br />Brookhurst Street <br />0 <br />3 <br />3 <br />17th Street <br />7 <br />6 <br />13 <br />Flower Street <br />2 <br />O <br />O <br />Civic Center Drive <br />6 <br />O <br />O <br />Santa Ana Boulevard <br />1 <br />O <br />O <br />Total <br />1 57 <br />1 11 <br />47 <br />Signalized intersections are currently linked with Westminster Avenue/17th Street's coordinated system <br />Note: Total intersection count = 58 <br />Overlapping intersection counts: Harbor Boulevard Corridor = 1 <br />The locations of the additional signalized intersections per arterial beyond the <br />Westminster/17th Street BRT Corridor limits is summarized in Table 4-6 at the end of <br />Section 4. <br />1.3 APPROACH TO TRAFFIC SIGNAL SYNCHRONIZATION DESIGN <br />FINALIZATION, IMPLEMENTATION, AND SUPPORT SERVICES <br />AUTHORITY shall issue one contract for TSS design finalization, <br />implementation, and support services on the three planned BRT corridors. <br />CONSULTANT shall be responsible for the activities specified in the SOW. <br />The first TSS corridor to be implemented is the Bristol/State College Boulevard <br />BRT Corridor. This corridor is approximately nineteen (19) miles in length and <br />Scope of Work 15 09/09/1 O <br />