My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0826)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0826)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 4:45:24 PM
Creation date
1/14/2011 8:20:49 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0826)
Contract #
N-2011-006
Agency
PUBLIC WORKS
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM OF UNDERSTANDING NO. C-9-0826 <br />EXHIBIT A <br />SECTION 3.OTRAFFIC SIGNAL SYNCHRONIZATION DESIGN FINALIZATION <br />3.1 PART "A" — BRISTOL/STATE COLLEGE BRT CORRIDOR TSS DESIGN <br />FINALIZATION SERVICES <br />3.1 .1 TASK A-1 : BRISTOL/STATE COLLEGE BRT CORRIDOR TSS DESIGN <br />FINALIZATION SERVICES — KICK-OFF MEETING <br />CONSULTANT shall have a kick-off meeting with the AUTHORITY to discuss the <br />following: <br />1 . Bristol/State College BRT Corridor alignment <br />2. List of arterial/collector roads <br />3. List of signalized intersections <br />4. Other projects along the Bristol/State College BRT Corridor <br />5. Goals and objectives of the Bristol/State College BRT Corridor TSS <br />6. Completed and remaining TSS Design Phase Project tasks <br />7. TSS analysis process <br />8. Review and approval coordination process <br />9. Project schedule, key milestones, and deliverables <br />3.1.2 TASK A-2: BRISTOL/STATE COLLEGE BRT CORRIDOR TSS DESIGN <br />FINALIZATION SERVICES — REVIEW COMPLETED TSS STUDY ALIGNMENT <br />VERIFICATION <br />Previous consultant reviewed the Bristol/State College BRT Corridor signalized <br />intersection list provided by the AUTHORITY and met with each affected agency <br />to verify the number of signalized intersections that would be included on each <br />arterial/collector road along the Bristol/State College BRT Corridor. <br />Previous consultant completed Bristol/State College BRT Corridor TSS <br />Alignment Draft and Final Reports showing the study area including the <br />arterials/collector roads and the number of signalized intersections that were <br />synchronized as part of this project. <br />AUTHORITY shall provide an electronic copy, in MS Word and Adobe Acrobat <br />(PDF) format, of the completed AUTHORITY and agencies approved TSS <br />Alignment Final Report to the CONSULTANT for review and background <br />information. <br />Scope of Work 30 05/18/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.