My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0826)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0826)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 4:45:24 PM
Creation date
1/14/2011 8:20:49 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0826)
Contract #
N-2011-006
Agency
PUBLIC WORKS
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM OF UNDERSTANDING NO. C-9-0826 <br />EXHIBIT A <br />Time -Space Diagram completed by the previous consultant, see Reference <br />Documents — Attachment B. <br />AUTHORITY shall provide electronic copies of the following completed and <br />AUTHORITY approved Bristol/State College Boulevard BRT Corridor Signal <br />Timing Optimization deliverables for CONSULTANT review and use: <br />1. All Draft optimized and synchronized traffic signal timing plans in Synchro <br />format, including (a) existing corridor conditions and (b) planned and <br />programmed improvements (widening projects and intersection <br />improvements) within the next five years (after NTP). <br />2. Draft Time -Space diagrams, in Adobe Acrobat (PDF) format and Tru — <br />Traffic TS/PP data files. <br />3. Draft Signal Timing Optimization Plan, in MS Word, MS Excel, and Adobe <br />Acrobat (PDF) format. <br />4. Electronic Synchro 7.0 data files used in the Draft analysis. <br />CONSULTANT shall submit a Final Signal Timing Optimization Plan to <br />AUTHORITY and agencies which addresses all comments provided by <br />AUTHORITY and agencies in the Draft Signal Timing Optimization Plan. <br />Bristol/State College BRT Corridor TSS Design deliverables (in part to include): <br />Ala. All Final optimized and synchronized traffic signal timing plans in Synchro <br />format and the preferred timing chart format of each agency, including (a) <br />existing corridor conditions and (b) planned and programmed <br />improvements (widening projects and intersection improvements) within <br />the next five years (after NTP). <br />Alb. Final Time -Space diagrams. <br />A7c. Final Signal Timing Optimization Plan. <br />A7d. Electronic Synchro 7.0 data files used in the Final analysis. <br />Ale. Electronic SimTraffic data files used in the Final analysis. <br />Alf. Electronic versions of the Final analysis and all data files including the Tru <br />— Traffic TS/PP files. <br />3.1.8 TASK A-8: BRISTOL/STATE COLLEGE BRT CORRIDOR TSS DESIGN <br />FINALIZATION SERVICES - PROJECT COORDINATION AND MEETINGS <br />CONSULTANT shall develop a schedule for meetings with AUTHORITY, <br />agencies, manufacturers, and others in order to facilitate the review/approval <br />Scope of Work 40 05/18/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.