My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0826)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0826)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 4:45:24 PM
Creation date
1/14/2011 8:20:49 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0826)
Contract #
N-2011-006
Agency
PUBLIC WORKS
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM OF UNDERSTANDING NO. C-9-0826 <br />EXHIBIT A <br />weekend peak. Timing plans shall be in both Synchro format and the <br />preferred timing chart format of each agency. <br />7. CONSULTANT shall update timing plans for a.m. peak, mid -day peak, <br />p.m. peak and a weekend peak based on the upcoming improvements for <br />the corridor as identified. Timing plans shall be in Synchro format and the <br />preferred timing chart format of each agency. <br />8. CONSULTANT shall review, verify, and update the previously prepared <br />Time -Space Diagrams for the synchronized segments along the BRT <br />Corridor. <br />Previous consultant prepared a Draft Signal Timing Optimization Plan detailing <br />the signal timing optimization, including detail evaluation and recommendation on <br />the time -referencing system and analysis results. The Draft Signal Timing <br />Optimization Plan included, but was not limited to, the following: <br />a. Proposed cycle lengths and signal groupings by corridor and by agency <br />b. All Draft optimized and synchronized traffic signal timing plans in Synchro <br />format, including (a) existing corridor conditions and (b) planned and <br />programmed improvements (widening projects and intersection <br />improvements) within the next five years (after NTP). <br />c. Draft Time -Space diagrams for the synchronized segments along the BRT <br />Corridor. <br />The Draft Signal Timing Optimization Plan was submitted to AUTHORITY and <br />agencies for review and comment. AUTHORITY has already provided their <br />review and all comments were addressed by the previous consultant. <br />AUTHORITY shall provide a copy of all AUTHORITY comments and agency <br />comments received. <br />CONSULTANT shall coordinate and collect from all agencies the Draft Signal <br />Timing Optimization Plan comments. CONSULTANT shall incorporate <br />comments into the Final Signal Timing Optimization Plan. <br />Final Time -Space diagrams shall match those completed by previous consultant <br />and submitted to the agencies for review and comment. The Time -Space <br />diagrams shall be in color, be scaled both horizontally and vertically, show <br />vehicle splits and movements for each intersection, show offsets and <br />intersection distances listed below the intersections, and show forward and <br />reverse green bands with applicable phase sequences. The Time -Space <br />diagrams shall be separated per signal grouping and peak period plan and fully <br />annotated with proposed cycle lengths, travel direction, signal grouping zone <br />limits, and peak period plan identification. All intersections with crossing <br />coordination, half cycle lengths, and existing and proposed pedestrian overrides <br />shall be annotated as such on the Time -Space Diagrams. For a sample Draft <br />Scope of Work 39 05/18/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.