Laserfiche WebLink
MEMORANDUM OF UNDERSTANDING NO. C-9-0826 <br />EXHIBIT A <br />TABLE 4-1 <br />Bristol/State College Boulevard BRT Corridor <br />TSS Time -Reference Equipment Recommendations <br />Agency <br />Intersection <br />TSS Time -Reference Equipment <br />Recommendation <br />Arterial <br />Cross Street <br />State College Boulevard <br />Imperial Highway / SR-90 <br />cu - 2070 w/ 6A telemetry module <br />State College Boulevard <br />SR-91 WB Ramps <br />cu - 2070 w/ 6A telemetry module, gps <br />State College Boulevard <br />SR-91 EB Ramps <br />cu - 2070 w/ 6A telemetry module <br />State College Boulevard <br />Orange Center Drive <br />cu - 2070 w/ 6A telemetry module <br />State College Boulevard <br />Anaheim Blvd / I-5 NB Ramps <br />cu - 2070 w/ 6A telemetry module, <br />cu — 170E TRFM, gps <br />Caltrans <br />State College Boulevard <br />I-5 SB Ramps <br />cu - 2070 w/ 6A telemetry module <br />La Veta Avenue <br />SR-22 WB On -Ramp / I-5 SB <br />Off -Ramp / I-5 NB to SR-22 WB <br />Connector Off -Ramp <br />cu — 170E TRFM, gps <br />Bristol Street <br />1-405 NB Off -Ramp <br />cu - 2070 w/ 6A telemetry module <br />Bristol Street <br />I-405 SB Ramps <br />cu - 2070 w/ 6A telemetry module <br />Note: cu = controller unit; gps = gps time source receiver <br />CONSULTANT shall test all furnished traffic signal equipment (including <br />software) as required by AUTHORITY, Caltrans, agencies, equipment <br />manufacturer(s), and/or other similarly involved third parties prior to the <br />installation of any equipment (including software). If malfunctions, problems, or <br />other issues related to the testing of equipment are observed by the <br />CONSULTANT, the AUTHORITY shall be notified in writing within twenty-four <br />(24) hours. <br />Upon written authorization by the AUTHORITY, CONSULTANT shall procure <br />and install, or assist agency staff in installing, any devices that are part of the <br />time -referencing strategy. This may include devices installed at the agency <br />traffic management center or at traffic signal controller cabinets. <br />Agencies shall be responsible for local intersection inspection services on the <br />installation of field work and equipment. Agencies shall be responsible for the <br />inspection and installation of any central master, field master, controller units or <br />assemblies and any related communications systems with oversight by the <br />AUTHORITY. CONSULTANT shall work under the constraints of construction <br />specifications and standards of each local agency and Caltrans. Caltrans <br />personnel will be responsible for the removal and installation of any Caltrans <br />owned or operated intersection controller systems. CONSULTANT will be <br />responsible for all other intersection systems modifications, removal, <br />installations, etc. <br />CONSULTANT shall provide onsite assistance for turn -on of any new or modified <br />equipment. <br />Scope of Work 68 05/18/10 <br />