MEMORANDUM OF UNDERSTANDING NO. C-9-0825 <br />EXHIBIT A <br />style and content of graphs and tables, shall be approved by the AUTHORITY <br />prior to submission. <br />The report shall document all planned and programmed improvements on the <br />Westminster/17th Street BRT Corridor as well as recommendations for further <br />infrastructure improvements that would likely improve the corridor signal <br />coordination project results. CONSULTANT shall present the final report and <br />results of the project to the AUTHORITY and city councils as required by <br />AUTHORITY in writing. <br />The report shall include for each intersection: lane configurations, signal phasing, <br />turning movement data, and cycle lengths for existing and proposed timings for <br />all peak periods. In addition, in a separate binder, all traffic signal phase <br />sequences, signal timing plans, and pedestrian timings shall be documented. <br />Finally, the report shall provide recommendations, including cost and benefit <br />estimates, for future improvements to traffic signal infrastructure (signal <br />controllers, vehicle detection, communications, etc.), intersection capacity <br />(appropriate signal phasing, lane geometrics, and alleviation of physical <br />bottlenecks that curtail arterial capacity), and traffic management strategies. <br />CONSULTANT shall submit a Final Westminster/17th Street BRT Corridor Final <br />Timings and Evaluation Technical Report to AUTHORITY and agencies which <br />addresses all comments provided by AUTHORITY and agencies in the Draft <br />Westminster/17th Street BRT Corridor Final Timings and Evaluation Technical <br />Report. <br />The Report format shall consist of a Table of Contents, Executive Summary, with <br />technical appendices giving the Background, Methodologies, Before Conditions, <br />After Conditions, Before and After Analysis and Study Results, Elements of <br />Implementation, Special Demonstration of Equipment and Results, Conclusions, <br />Recommendations and Lessons Learned, followed by Appendices. As each <br />corridor has unique properties and functionality, prior to the Report being written, <br />the CONSULTANT shall meet with the AUTHORITY to discuss format and <br />content for each of the respective corridors. <br />Westminster/17th Street BRT Corridor TSS Implementation Services deliverables <br />(in part to include): <br />C7a. Draft Westminster/17th Street BRT Corridor Final Timings and Evaluation <br />Technical Report. <br />C7b. Final Westminster/17th Street BRT Corridor Final Timings and Evaluation <br />Technical Report. <br />C7c. Presentations to the AUTHORITY and City Councils. <br />Scope of Work 94 05/18/1 O