Laserfiche WebLink
MEMORANDUM OF UNDERSTANDING NO. C-9-0825 <br />EXHIBIT A <br />Travel runs to the AUTHORITY for approval. For the "After" Study, <br />CONSULTANT shall conduct the same number of floating car 'runs' in each <br />direction during the same time periods as was done in the "Before" study. <br />The CONSULTANT shall provide a synchronized video with the "After" travel <br />time runs to augment the study. This video shall cover the entire length of the <br />corridor and concentrate on the most congested areas of the corridor around <br />freeways and high density commercial and business uses. <br />CONSULTANT shall prepare a Westminster/17th Street BRT Corridor "After" <br />Study Project Report detailing the results of the signal timing optimization and <br />implementation, time-referencing system, fine tuning components, and <br />comparing the results of the "Before" and "After" field study with reference to the <br />specific MOE's. CONSULTANT shall present the findings to the AUTHORITY. <br />CONSULTANT shall also provide all floating car data results collected as part of <br />this task including, but not limited to, overall output statistics (distances, travel <br />time, number of stops, average speed compared to posted speed, total delay, <br />etc.), fuel consumption and emissions, speed/distance profiles, and time/space <br />trajectories of all runs shown on a per link /node basis. CONSULTANT shall <br />finalize the Westminster/17th Street BRT Corridor "After" Study Project Report <br />based on comments received from the AUTHORITY and agencies. <br />Westminster/17th Street BRT Corridor TSS Implementation Services deliverables <br />(in part to include): <br />C6a. "After" Study Project Report. <br />C6b. Electronic versions of the "After" Study analysis and all floating car data <br />files. <br />4.4.7 TASK C-7: WESTMINSTER/17TH STREET BRT CORRIDOR TSS <br />IMPLEMENTATION SERVICES -PROJECT REPORT <br />CONSULTANT shall prepare a Draft Westminster/17th Street BRT Corridor Final <br />Timings and Evaluation Technical Report, including an executive summary. The <br />report shall provide complete documentation of the project, including, but not <br />limited to, project objectives, project locations, project scope, findings, <br />recommendations, implementation schedule, improvements accomplished, <br />furnished equipment test results, and procedures for continuing maintenance, <br />surveillance, and evaluation of the coordinated signal system, work performed, <br />data collected: "Before" and "After" studies and project benefits achieved in terms <br />of fuel savings, travel time, and other measurable parameters. The report shall <br />include graphical and table formats for each type of documentation for clarity <br />purposes. The report shall also equate or quantify any savings in travel time, <br />reduction in delay and emissions with type of emissions measured into a <br />monetary figure consistent with current publications. Report formats, including <br />Scope of Work 93 05/18/1 O