My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY OCTA (3) - 2011
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY OCTA (3) - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:52:32 AM
Creation date
1/14/2011 8:39:42 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY OCTA
Contract #
N-2011-005
Agency
PUBLIC WORKS
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM OF UNDERSTANDING NO. C-9-0825 <br />EXHIBIT A <br /> Harbor Boulevard BRT Corridor -Signal <br />55 Boa Synchronization Equipment 4.3.4 <br /> AUTHORITY/a encies Notifications <br /> Harbor Boulevard BRT Corridor -Signal <br />56 65a Synchronization Equipment Guarantee 4.3.5 <br /> Certification <br /> <br />57 <br />B6a Harbor Boulevard BRT Corridor - "After" Study <br />4 <br />3 <br />6 <br /> Project Report . <br />. <br /> Harbor Boulevard BRT Corridor -Electronic <br />58 66b versions of the "After" Study analysis and all 4.3.6 <br /> floatin car data files <br /> Harbor Boulevard BRT Corridor -Draft Harbor <br />59 B7a Boulevard BRT Corridor Final Timings and 4.3.7 <br /> Evaluation Technical Re ort <br /> Harbor Boulevard BRT Corridor -Final Harbor <br />60 67b Boulevard BRT Corridor Final Timings and 4.3.7 <br /> Evaluation Technical Re ort <br /> <br />61 <br />67c Harbor Boulevard BRT Corridor - Presentations <br />4 <br />3 <br />7 <br /> to the AUTHORITY and City Councils . <br />. <br />62 B8a Harbor Boulevard BRT Corridor -Project Meeting 4 <br />8 <br />3 <br /> Agendas . <br />. <br /> Harbor Boulevard BRT Corridor -Project Meeting <br />63 B8b Minutes and Action Items 4.3.8 <br />64 B8c Harbor Boulevard BRT Corridor -Action Item 4 3 8 <br /> Matrix <br /> Westminster/17 Street BRT Corridor -Technical <br /> memorandum containing field implementation of <br /> optimized traffic signal plans for existing corridor <br />65 C1a conditions, including all required fine tuning and 4.4.1 <br /> timing charts as requested by AUTHORITY and <br /> agency, and final signal timing implementation <br /> Ian. <br /> <br />66 <br />C2a Westminster/17 Street BRT Corridor -List of <br />4 <br />4 <br />2 <br /> Materials, Units, and Prices . <br />. <br /> <br />67 <br />C2b Westminster/17 Street BRT Corridor -Copies of <br />4 <br />4 <br />2 <br /> All Purchase Orders and Product Manuals . <br />. <br /> Westminster/17 Street BRT Corridor -Signal <br />68 C3a Synchronization Equipment Installation Schedule 4.4.3 <br /> Westminster/17 Street BRT Corridor -Signal <br />69 C4a Synchronization Equipment 4.4.4 <br /> AUTHORITY/a encies Notifications <br /> Westminster/17th Street BRT Corridor -Signal <br />70 C5a Synchronization Equipment Guarantee 4.4.5 <br /> Certification <br />Scope of Work 109 05/18/1 O
The URL can be used to link to this page
Your browser does not support the video tag.