Laserfiche WebLink
MEMORANDUM OF UNDERSTANDING NO. C-9-0825 <br />EXHIBIT A <br /> <br />39 <br />Alb Bristol/State College BRT Corridor -Copies of All <br />4 <br />2 <br />1 <br /> Purchase Orders and Product Manuals . <br />. <br /> <br />40 <br />A3a Bristol/State College BRT Corridor -Signal <br />4 <br />2 <br />2 <br /> Synchronization Equipment Installation Schedule ' <br />' <br /> Bristol/State College BRT Corridor -Signal <br />41 A4a Synchronization Equipment 4.2.3 <br /> AUTHORITY/agencies Notifications <br /> Bristol/State College BRT Corridor -Signal <br />42 Asa Synchronization Equipment Guarantee 4.2.5 <br /> Certification <br /> <br />43 <br />A6a Bristol/State College BRT Corridor - "After" Study <br />4 <br />2 <br />6 <br /> Project Report ' <br />. <br /> Bristol/State College BRT Corridor -Electronic <br />44 A6b versions of the "After" Study analysis and all 4.2.6 <br /> floatin car data files <br /> Bristol/State College BRT Corridor -Draft <br />45 Ala Bristol/State College BRT Corridor Final Timings 4.2.7 <br /> and Evaluation Technical Report <br /> Bristol/State College BRT Corridor -Final <br />46 Alb Bristol/State College BRT Corridor Final Timings 4.2.7 <br /> and Evaluation Technical Report <br /> Bristol/State College BRT Corridor - <br />47 A7c Presentations to the AUTHORITY and City 4.2.7 <br /> Councils <br /> <br />48 <br />A8a Bristol/State College BRT Corridor -Project <br />4 <br />2 <br />8 <br /> Meeting Agendas . <br />. <br /> <br />49 <br />A8b Bristol/State College BRT Corridor -Project <br />4 <br />2 <br />8 <br /> Meeting Minutes and Action items ' <br />' <br />50 A8c Bristol/State College BRT Corridor -Action Item 4 2 8 <br /> Matrix <br /> Harbor Boulevard BRT Corridor -Technical <br /> memorandum containing field implementation of <br /> optimized traffic signal plans for existing corridor <br />51 61 a conditions, including all required fine tuning and 4.3.1 <br /> timing charts as requested by AUTHORITY and <br /> agency, and final signal timing implementation <br /> Ian. <br /> <br />52 <br />B2a Harbor Boulevard BRT Corridor -List of <br />4 <br />3 <br />2 <br /> Materials, Units, and Prices . <br />. <br /> <br />53 <br />B2b Harbor Boulevard BRT Corridor -Copies of All <br />4 <br />3 <br />2 <br /> Purchase Orders and Product Manuals . <br />. <br /> <br />54 <br />63a Harbor Boulevard BRT Corridor -Signal <br />4 <br />3 <br />3 <br /> Synchronization Equipment Installation Schedule . <br />. <br />Scope of Work 108 05/18/1 O