Laserfiche WebLink
MEMORANDUM OF UNDERSTANDING NO. C-9-0825 <br />EXHIBIT A <br />AUTHORITY shall provide a copy of all AUTHORITY comments and agency <br />comments received. <br />CONSULTANT shall coordinate and collect from all agencies the Draft Signal <br />Timing Optimization Plan comments. CONSULTANT shall incorporate <br />comments into the Final Signal Timing Optimization Plan. <br />Final Time-Space diagrams shall match those previously completed by previous <br />consultant and submitted to the agencies for review and comment. The Time- <br />Space diagrams shall be in color, be scaled both horizontally and vertically, show <br />vehicle splits and movements for each intersection, show offsets and <br />intersection distances listed below the intersections, and show forward and <br />reverse green bands with applicable phase sequences. The Time-Space <br />diagrams shall be separated per signal grouping and peak period plan and fully <br />annotated with proposed cycle lengths, travel direction, signal grouping zone <br />limits, and peak period plan identification. All intersections with crossing <br />coordination, half cycle lengths, and existing and proposed pedestrian overrides <br />shall be annotated as such on the Time-Space Diagrams. For a sample Draft <br />Time-Space Diagram completed by the previous consultant, see Reference <br />Documents - Attachment B. <br />AUTHORITY shall provide electronic copies of the following completed and <br />AUTHORITY approved Harbor Boulevard BRT Corridor Signal Timing <br />Optimization deliverables for CONSULTANT review and use: <br />1. All Draft optimized and synchronized traffic signal timing plans in Synchro <br />format, including (a) existing corridor conditions and (b) planned and <br />programmed improvements (widening projects and intersection <br />improvements) within the next five years (after NTP). <br />2. Draft Time-Space diagrams, in Adobe Acrobat (PDF) format and Tru - <br />Traffic TS/PP data files. <br />3. Draft Signal Timing Optimization Plan, in MS Word, MS Excel, and Adobe <br />Acrobat (PDF) format. <br />4. Electronic Synchro 7.0 data files used in the Draft analysis. <br />CONSULTANT shall submit a Final Signal Timing Implementation Plan to <br />AUTHORITY and agencies, which addresses all comments provided by <br />AUTHORITY and agencies in the Draft Signal Timing Optimization Plan. <br />Harbor Boulevard BRT Corridor TSS Design deliverables (in part to include): <br />137a. All Final optimized and synchronized traffic signal timing plans in Synchro <br />format and the preferred timing chart format of each agency, including (a) <br />existing corridor conditions and (b) planned and programmed <br />Scope of Work 51 05/18/10