Laserfiche WebLink
MEMORANDUM OF UNDERSTANDING NO. C-9-0825 <br />EXHIBIT A <br />B8a. Project Meeting Agendas. <br />68b. Project Meeting Minutes and Action items. <br />B8c. Action Item Matrix. <br />3.3 PART "C" - WESTMINSTER/171th STREET BRT CORRIDOR TSS DESIGN <br />FINALIZATION SERVICES <br />3.3.1 TASK C-1: WESTMINSTER/17TH STREET BRT CORRIDOR TSS DESIGN <br />FINALIZATION SERVICES - KICK-OFF MEETING <br />CONSULTANT shall have a kick-off meeting with the AUTHORITY to discuss the <br />following: <br />1. Westminster/17th Street BRT Corridor alignment <br />2. List of arterial/collector roads <br />3. List of signalized intersections <br />4. Other projects along the Westminster/17th Street BRT Corridor <br />5. Goals and objectives of the Westminster/17th Street BRT Corridor TSS <br />6. Completed and remaining TSS Design Phase Project tasks <br />7. TSS analysis process <br />8. Review and approval coordination process <br />9. Project schedule, key milestones, and deliverables <br />3.3.2 TASK C-2: WESTMINSTER/17TH STREET BRT CORRIDOR TSS DESIGN <br />FINALIZATION SERVICES - REVIEW COMPLETED TSS STUDY ALIGNMENT <br />VERIFICATION <br />Previous consultant reviewed the Westminster/17th Street BRT Corridor <br />signalized intersection list provided by the AUTHORITY and met with each <br />affected agency to verify the number of signalized intersections that would be <br />included on each arterial/collector road along the Westminster/17th Street BRT <br />Corridor. <br />Previous consultant completed Westminster/17th Street BRT Corridor TSS <br />Alignment Draft and Final Reports showing the study area including the <br />arterials/collector roads and the number of signalized intersections that were <br />synchronized as part of this project. <br />Scope of Work 53 05/18/10