My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY OCTA (3) - 2011
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY OCTA (3) - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:52:32 AM
Creation date
1/14/2011 8:39:42 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY OCTA
Contract #
N-2011-005
Agency
PUBLIC WORKS
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM OF UNDERSTANDING NO. C-9-0825 <br />EXHIBIT A <br />GPS clocks), and associated equipment that will be procured and installed by the <br />CONSULTANT. AUTHORITY and the agencies shall review and AUTHORITY <br />shall approve in writing the list of materials, number of units, and prices prior to <br />ordering the equipment by CONSULTANT. <br />Harbor Boulevard BRT Corridor TSS Implementation Services deliverables (in <br />part to include): <br />B2a. List of Materials, Units, and Prices. <br />B2b. Copies of All Purchase Orders and Product Manuals. <br />4.3.3 TASK B-3: HARBOR BOULEVARD BRT CORRIDOR TSS IMPLEMENTATION <br />SERVICES- EQUIPMENT INSTALLATION SCHEDULING OF WORK <br />CONSULTANT shall provide an equipment installation schedule for the Harbor <br />Boulevard BRT Corridor showing the activities, days, and locations that the <br />equipment will be installed and tested. The installation schedule shall also <br />indicate any implementation work that may be conducted by others at the same <br />intersections under separate projects. <br />CONSULTANT shall furnish AUTHORITY with four (4) hard copies and four (4) <br />electronic copies (in a media approved in writing by AUTHORITY) of a written <br />timetable showing the proposed schedule of work. The schedule of work shall <br />be submitted for approval to AUTHORITY and the agencies at least thirty (30) <br />days prior to the beginning of the equipment installation and shall be updated on <br />a monthly basis thereafter for the duration of the TSS Implementation Phase. <br />Harbor Boulevard BRT Corridor TSS Implementation Services deliverables (in <br />part to include): <br />B3a. Signal Synchronization Equipment Installation Schedule. <br />4.3.4 TASK B-4: HARBOR BOULEVARD BRT CORRIDOR TSS IMPLEMENTATION <br />SERVICES -EQUIPMENT INSTALLATION COORDINATION, INSTALLATION <br />MANPOWER. AND INSTALLATION RESTRICTIONS <br />CONSULTANT shall coordinate installation, modification, and/or upgrade of <br />traffic signal equipment with the AUTHORITY and the agencies. CONSULTANT <br />shall coordinate the work of the various trades and crafts to avoid possible <br />interferences, duplication of work, or unfinished gaps, and conflicts between <br />operations. The various trades and crafts shall agree that, due to field <br />conditions, minor departures from the improvement plans are bound to occur, <br />and that such departures are self compensation so far as cost of additions or <br />deductions are concerned. No claims for extras or time extensions will be <br />allowed in connection with such minor changes due solely to field conditions. <br />Scope of Work 80 05/'18/'10
The URL can be used to link to this page
Your browser does not support the video tag.