Laserfiche WebLink
Chapter 3 - Findings Regarding Project Alternatives <br />3.1 Introduction <br />The EIR prepared for the San Lorenzo Sewer Lift Station Project considered numerous alternatives <br />to the Proposed Project and ultimately analyzed two (2) of these alternatives in detail. This chapter <br />describes the Project's objectives and design criteria used to develop and evaluate the project <br />alternatives presented in the Draft EIR. A description of the alternatives compared to the Proposed <br />Project and the findings regarding the feasibility of adopting the described alternatives are presented <br />below. <br />3.2 Project Objectives <br />The project objectives of the proposed San Lorenzo Sewer Lift Station Project are as follows: <br />• To construct a new sewage lift station (the San Lorenzo Lift Station) near the intersection of <br />South Bristol Street and West Segerstrom Avenue to replace an existing lift station that has <br />exceeded its design life (the Segerstrom Lift Station). <br />• To install modern lift station equipment and associated wastewater conveyance infrastructure <br />to provide system redundancies in order to reduce the potential of a sewer spill. <br />• To provide a lift station facility in which electrical components of the facility are housed <br />above ground so as to preclude the potential for electrical failure during peak storm events <br />(due to flooding). <br />• To construct a lift station facility that provides sufficient access space for maintenance of the <br />lift station facility. <br />• To improve safety for both motorists and City workers by providing for an above-ground lift <br />station facility located outside of existing roadway rights-of-way. <br />• To minimize odor-related nuisances to land uses in close proximity to the new sewage lift <br />station through the installation of a gravity odor control system. <br />• To install landscape and hardscape improvements in areas that will be disturbed by lift station <br />construction. <br />• To safely demolish and abandon the existing Segerstrom Lift Station in accordance with <br />applicable federal, state, and local regulations and standards. <br />3.3 Selection of Alternatives <br />The Draft EIR evaluated two (2) alternatives, including the No Project Alternative, in Chapter 5.0. <br />This evaluation compared the environmental advantages and disadvantages of each alternative to the <br />Proposed Project. The No Project Alternative, as required by CEQA, considers a scenario in which <br />no new lift station facility would be constructed and the existing lift station north of the South Bristol <br />San Lorenzo Lift Station EIR (Project No. 06-3510) 3-1 <br />Findings of Fact/Statement of Overriding Consideration <br />_2