Laserfiche WebLink
Chapter 3 Findings Regarding Project Alternatives <br />Street/West Segerstrom Avenue intersection would continue operating as it does under existing <br />conditions. The Modified Construction Configuration C.2 Alternative addressed an alternative to the <br />Proposed Project that would reduce or eliminate the Project's significant and unavoidable impact to <br />the intersection of South Bristol Street/West Segerstrom Avenue by modifying the construction <br />schedule for portions of construction Phases 11, 14 and 16. <br />The range of feasible alternatives was selected and discussed in a manner to foster meaningful public <br />participation and informed decision-making. Among the factors that were taken into account when <br />considering the feasibility of alternatives (as described in CEQA Guidelines Section 15126.6[f][1]) <br />were environmental impacts, economic viability, availability of infrastructure, regulatory limitations, <br />jurisdictional boundaries, and attainment of the Project's objectives. As stated in Section 15126.6(a) <br />of the CEQA Guidelines, an EIR need not consider an alternative whose effects could not be <br />reasonably identified, whose implementation is remote or speculative, or one that would not achieve <br />the basic project objectives. The analysis includes sufficient information about each alternative to <br />provide meaningful evaluation, analysis, and comparison with the Proposed Project. <br />3.4 Project Alternative Findings <br />The Lead Agency's findings on each alternative and the rationale behind each finding are set forth <br />below. <br />3.4.1 No Project Alternative <br />3.4.1.1 Summary of the No Project Alternative <br />The No Project Alternative is included in the EIR Alternatives analysis (Section 5.4.1) as required <br />pursuant to CEQA Guidelines Section 15126.6(e). The CEQA Guidelines require evaluation of an <br />alternative that considers what would reasonably be expected to occur on the property in the <br />foreseeable future if the Project were not approved, based on current plans and consistent with <br />available infrastructure and community services. The No Project Alternative therefore assumes that <br />the Proposed Project is not approved and the existing Segerstrom Lift Station facility located beneath <br />South Bristol Street would continue operating into the foreseeable future. Construction of a new lift <br />station facility, new underground sewer infrastructure, and sewer manholes and appurtenances <br />associated with a new lift station would not occur under this alternative. The existing lift station <br />facility beneath South Bristol Street would not be demolished under this alternative and would <br />continue operating. No landscape or hardscape improvements would occur under this alternative. <br />3.4.1.2 Comparison of Environmental Effects <br />The impacts of this alternative were evaluated and compared to those of the Proposed Project. As <br />concluded in the Final EIR, implementation of the No Project Alternative would eliminate all of the <br />Project's near-term construction-related impacts. However, several long-term impacts would <br />increase with implementation of this alternative, including increased impacts to air quality, <br />hazards/hazardous materials, transportation/traffic, and water quality/hydrology. Long-term impacts <br />from noise would be slightly reduced under this alternative due to the increased distance between the <br />existing lift station facility and nearby sensitive receptors. <br />3.4.1.3 Findings for the No Project Alternative <br />The City hereby finds that specific economic, legal, social, technological, or other considerations <br />make the adoption of the No Project Alternative infeasible. <br />San Lorenzo Lift Station EIR (Project No. 06-3510) 3-2 <br />Findings of Fact/Statement of Overriding Considerations <br />55B-27