My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55B - RESO - EIR SAN LORENZO SEWER LIFT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
02/07/2011
>
55B - RESO - EIR SAN LORENZO SEWER LIFT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:53:43 PM
Creation date
2/1/2011 4:12:23 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
55B
Date
2/7/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 3 Findings Regarding Project Alternatives <br />removal of traffic control measures while still allowing for construction activities to occur. <br />According to the Project's engineer, such time restrictions would limit construction activities to <br />about 1-2 hours per day before construction activities would need to cease in order to ensure that <br />traffic control is removed by 2:30 p.m. Such time restrictions are considered infeasible from a <br />practical perspective because they would dramatically elongate the construction schedule for <br />construction activities within the intersection from up to 10 days (2 weeks Monday - Friday) to <br />approximately 40-80 days (based on an assumption of one to two working hours per day with traffic <br />control, and approximately 80 working hours needed to complete construction within the <br />intersection). The time restrictions also would elongate the construction schedule for work within <br />South Bristol Street, which would increase from approximately 15 days (3 weeks Monday - Friday) <br />to 60-120 days (based on an assumption of one to two working hours per day with traffic control, and <br />approximately 120 working hours needed to complete the portion of construction within South <br />Bristol Street requiring access to two northbound travel lanes). With an elongated construction <br />schedule of up to 175 days (35 weeks, or nearly 9 months), construction costs would be increased <br />and construction equipment and associated activities would be a nuisance to adjacent land uses for a <br />longer period of time. <br />On balance, the City finds that the reduction in impacts to transportation/traffic that would occur <br />under this alternative do not justify the significant and unavoidable impacts to noise that would result <br />from the nighttime construction activities required for this alternative. <br />3.4.3 Findings on Alternatives that were Considered but Eliminated from <br />Detailed Analysis in the Draft EIR <br />In addition to the two alternatives evaluated in the Draft EIR, the Lead Agency considered alternative <br />site locations and two other alternatives. With exception of the No Takings Alternative, all of these <br />additional site locations and alternatives were eliminated from detailed analysis in the EIR either <br />because they did not meet the Project's basic objectives or would fail to reduce or avoid the <br />significant impacts of the Project as proposed. These alternatives are discussed below. <br />3.4.3.1 Alternative Site Locations <br />Under this alternative, a replacement lift station facility would be constructed at another location <br />within the Project vicinity. Section 5.3.1 of the Final EIR contains a discussion of alternative site <br />locations considered but rejected from detailed analysis in the EIR. In addition, in response to public <br />comments received on the Draft EIR, an analysis of an additional 21 site locations also is provided in <br />the Final EIR (refer to Responses E-111 through E-127 in Section F.3.3 of the Final EIR). <br />The City hereby finds that specific economic, legal, social, technological or other considerations <br />make the adoption of an alternative site location infeasible. Specifically, and as described in detail in <br />Section 5.3.1 and in Responses E-111 through E-127, adoption of an alternative site location would <br />fail to reduce or avoid the Project's significant and unavoidable impact to the South Bristol <br />Street/West Segerstrom Avenue intersection during construction. A summary of the analysis and <br />conclusions presented in the Final EIR is provided below. <br />Alternative site locations to the east or west of the proposed San Lorenzo Sewer Lift Station site <br />would require the implementation of Construction Configuration C.2 for a period of up to five weeks <br />during construction, and would result in the same significant and unavoidable impact to the <br />intersection of South Bristol Street/West Segerstrom Avenue that would occur under the Proposed <br />San Lorenzo Lift Station EIR (Project No. 06-3510) 3-5 <br />Findings of Fact/Statement of Overriding Considerations <br />55B-30
The URL can be used to link to this page
Your browser does not support the video tag.