Laserfiche WebLink
**END OF CONSENT CALENDA~R** <br />BUSINESS CALENDAR <br />C. COMMISSIONER COMMUNICATION DISCLOSURE (REGARDING AGENDIZED <br />PROJECTS) <br />No comments were made. <br />PROCEDURAL RULES <br />PUBLIC HEARINGS <br />1. HISTORIC EXTERIOR MODIFICATION AMENDMENT NO.2006-01 <br />Filed by Raul Yanez to request Historic Resources Commission approval for <br />exterior modifications to the Contributive structure known as the Shaffer- <br />Wakeham Building located at 108 East Fourth Street. <br />PUBLISHED IN THE ORANGE COUNTY REPORTER: May 19, 2006 <br />PUBLICLY NOTICED: May 19, 2006 <br />RECOMMENDATION: <br />Adopt a resolution approving a Certificate of Appropriateness for Historic Exterior <br />Modification Application No. 2006-01. <br />Associate Planner Hally Soboleske presented the staff report and <br />recommendation. <br />Commission discussion ensued regarding tenants occupying the suite, and <br />justification for modification of the structure. Ms. Soboleske commented on <br />upgrades to the area that would accommodate disabled persons, safety features <br />for one single opening, and maintaining consistency among the bays. <br />Commission voiced concern with expansion of the glass on either side, having <br />wider glass windows for display and no longer consistent with architectural <br />structure and overhead transoms. Commission discussed the load bearing <br />column, the interior partition wall that was removed, and changes matching the <br />marble base. Clarification was provided for categorization that was placed as <br />"Key". <br />The public hearing was opened. <br />No public comments were made. <br />The public hearing was closed. <br />MOTION: Adopt a resolution approving a Certificate of Appropriateness for <br />Historic Exterior Modification Application No. 2006-01 and add additional <br />condition of approval that requires applicant to revise his plans to include a <br />single transom window over the two center doors and additional condition to <br />have structural analysis with regard to the removal of the center beam with staff's <br />approval. <br />Chair Cook-Giles requested a continuance to review revised elevations and detail <br />drawings. Planning Manager Haluza indicated staff had sufficient information to have <br />applicant comply with alterations; if structural alterations required, the item will come <br />back to the Commission. <br />Historic Resources Commission Minutes 2 June 1, 2006 <br />