Laserfiche WebLink
REVISED <br />WORK STUDY SESSION <br /> <br />D. BROADWAY DISTRICT CURBS. GUTTERSM AND SIDEWALKS <br />George Alvarez, City Engineer, discussed the preservation of the historic curbs <br />and gutters along the Broadway corridor. Types of curbs currently in use and <br />proposed replacements were outlined. Discussion regarding ADA requirements <br />held. Mr. Alvarez advised the Commission that when replacement was <br />necessary proposals would be brought to the Commission for their review. <br />E. SYCAMORE GARAGE LIVENVORK PROJECT <br />Sergio Klotz, Associate Planner II provided a description of the Live/Work project <br />and a status update. Madam Chair Kings commented that this was an example <br />of a project that the Commission felt they should have been allowed to review <br />prior to final approval by the City Council. Comm(ssioner Richardson advised <br />that in the future, Historic Resources Commission comments should be put in <br />writing so that either staff or he could present them to the Planning Commission. <br />Sergio Klotz also provided a description of the Sycamore Garage project and a <br />status update. Discussion held regarding the parking needs of the downtown <br />area. Ms. Nelson commented that the garage will provide needed parking for <br />several buildings and make them more attractive to prospective tenants. <br />Commission suggestions included keeping the building height down as much as <br />possible, enhance the landscaping and lighting, covering the walls with vines to <br />deter graffiti, and making more permanent upgraded improvements to the <br />existing surface parking lot on Broadway.. <br />C <br />F. OBJECTIVE #9 -DEVELOP HISTORIC DISTRICT PROCESS <br />Objective update provided by Charles View. He noted that process guidelines <br />were identified as due by May 2002. The Commission had identified Logan as <br />the next district they wished to review and a survey was due by June 2002. <br />Using the Broadway district as a model, staff will work with the Commission to <br />identify preliminary boundaries and, based on those preliminary boundaries, do a <br />field visit to see what is there. A work/study session will follow to create draft <br />standards and guidelines. Staff will then use the draft to create an action item to <br />be brought to the Commission and then to the Planning Commission and City <br />Council as was done with Broadway. Using the Broadway model for design <br />standards will create guidelines for use by staff and the Planning Commission to <br />evaluate new construction but will not create a new construction review <br />component for the Historic Resources Commission. He advised the <br />Commission that if that was a consideration that they wish to bring back up they <br />should advise staff, as it is not part of what has been modeled. <br />The Commission recessed at 5:40 p.m. for 10 minutes. <br />PUBLIC HEARINGS <br /> <br />PROCEDURAL RULES <br />1. HISTORIC RESOURCE DEMOLITION N0.2001-01. 02LAND 03 <br />Filed by the City of Santa Ana to discuss the noflce of intent to demolish <br />the fhree structures located of 1007-1009, 1015, and 1109 North Broadway <br />lisfed on the Santa Ana Register of Historic Properties as part of the One <br />Broadway Plaza high-rise office projecf. <br />HISTORIC RESOURCES COMMISSION MINUTES 3 JANUARY 3, 2002 <br />