My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KIMLEY-HORN & ASSOCIATES 6 - 2010
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
KIMLEY-HORN & ASSOCIATES 6 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2017 1:36:45 PM
Creation date
2/14/2011 11:25:23 AM
Metadata
Fields
Template:
Contracts
Company Name
KIMLEY-HORN & ASSOCIATES
Contract #
A-2010-215
Agency
PLANNING & BUILDING
Council Approval Date
11/15/2010
Insurance Exp Date
7/2/2011
Destruction Year
2017
Notes
Amended by A-2010-215-01
Document Relationships
KIMLEY-HORN & ASSOCIATES ,INC. 6A - 2010
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Kimley-Horn will interview one or more of the following state or local agencies to obtain <br />site specific information: <br />City of Santa Ana Hire Department <br />Orange County Environmental Health Department <br />Department of Toxic and Substance Control <br />TASK 2.3 REPORT PREPARATION <br />Upon completion of the Tasks 2.1 and 2.2 activities, Kimley-Horn will prepare a summary report <br />of the results of the Phase I ESA. The report will be formatted consistent with Appendix X4 of <br />ASTM E 1527-05 and will contain the following: <br />• Phase I documentation <br />• USGS Quad map(s) <br />• Aerial photograph(s) of the site <br />• Database search records <br />• Site photographs <br />• Description of field activities and site reconnaissance documentation <br />• Interview documentation <br />• Findings and identified REC's <br />• EP opinion on need for additional investigation <br />• Identification of, and opinion on significant data gaps <br />• Conclusions <br />• EP statement consistent with ASTM E 1527-05,12.13 <br />• Qualifications of EP and staff working on Phase I ESA <br />TASK 3 AIR QUALITY I GLOBAL CLIMATE CHANCE ANALYSIS <br />Scientific Resources Associated (SRA) will sub -contract with Kimley-Horn to prepare an <br />evaluation of potential air quality and global climate change impacts associated with the <br />proposed project. <br />TASK 3.1 EVALUATE EMISSIONS FROM PROJECT CONSTRUCTION <br />SRA will conduct a project -specific construction evaluation to assess potential impacts from <br />construction of the project. The analysis will be based on information provided by the City <br />regarding construction schedules and requirements, including workforce, construction <br />equipment, and grading/earth-moving amounts. SRA is proposing to estimate emissions using <br />the URBEMIS 2007 Model, Version 9.2.4. SRA will compare emissions with Southern California <br />Air Quality Management District (SCAQMD) significance thresholds and evaluate the effect of <br />mitigation measures, if appropriate. In addition, SRA will conduct a screening analysis of <br />localized impacts based on the SCAQMD Localized Significance Threshold methodology, which <br />provides estimates of the potential for air quality impacts due to construction and operations <br />based on project size and proximity of receptors. <br />City of Santa Ana - 4 - Kimley-Horn and Associates, Inc. <br />MND for McDonald's Restaurant April 30, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.