My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KIMLEY-HORN & ASSOCIATES 6 - 2010
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
KIMLEY-HORN & ASSOCIATES 6 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2017 1:36:45 PM
Creation date
2/14/2011 11:25:23 AM
Metadata
Fields
Template:
Contracts
Company Name
KIMLEY-HORN & ASSOCIATES
Contract #
A-2010-215
Agency
PLANNING & BUILDING
Council Approval Date
11/15/2010
Insurance Exp Date
7/2/2011
Destruction Year
2017
Notes
Amended by A-2010-215-01
Document Relationships
KIMLEY-HORN & ASSOCIATES ,INC. 6A - 2010
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 3.2 EVALUATE CRITERIA POLLUTANT EMISSIONS <br />SRA will estimate the emissions associated with the proposed project. The analysis will address <br />potential increases in area sources (energy use, landscaping, etc.) and vehicle emissions. In <br />addition, SRA will address potential emissions associated with cooking and vehicle idling in the <br />drive-through. Because of the size of the project, SRA assumes that no CO "hot spots" analysis will <br />be required. In the event that the traffic analysis indicates a degradation in Level of Service due <br />to project -related traffic, the analysis for the CO "hot spots" will be considered additional services. <br />SRA will also conduct a Localized Significance Analysis based on on-site emissions associated <br />with vehicle idling and McDonald's operations. <br />TASK 3.3 GLOBAL CLIMATE CHANGE EVALUATION <br />To address the requirements of the recently adopted CEQA guidelines, SRA will conduct a <br />greenhouse gas analysis in accordance with CEQA requirements and SCAQMD draft guidance. <br />The analysis will include quantification of emissions of greenhouse gases, a discussion of the <br />consistency of the project with the applicable Climate Action Plan(s), and a discussion of the <br />project's consistency with the goals of AB 32. Because of the size of the project, SRA anticipates <br />that the analysis will demonstrate that emissions would not result in a significant impact on <br />global climate. <br />If required, SRA assumes that McDonald's will provide information on projected energy and <br />water use for the project that will serve as the basis for the evaluation, along with proposed <br />measures to reduce greenhouse gas emissions such as energy efficiency measures and water <br />conservation measures. <br />TASK 3.4 PREPARE TECHNICAL REPORT <br />SRA will prepare an Air Quality Technical Report and Global Climate Change Report that <br />summarize the analysis conducted for Tasks 3.1 through 3.3. The reports will summarize the <br />results of the analyses. SRA assumes we will address one round of comments in this task. <br />TASK 4 -- TRAFFIC IMPACT STUDY <br />A traffic impact study will be prepared in accordance with the traffic study requirements of the <br />City of Santa Ana. The traffic study will address the project's traffic -related impacts on the street <br />system surrounding the project site: The study will also provide an evaluation of site access, on- <br />site circulation, and drive-through queuing. The following tasks are envisioned. <br />• Conduct a site visit to observe existing traffic conditions on the streets surrounding the <br />project site and at the study intersection. <br />• Obtain a copy of the project site plan for the proposed project, including building square <br />footages and uses, site layout, site driveways, parking supply, and any other site features <br />that will affect the traffic analysis. <br />City of Santa Ana - 5 - Kimiey-Horn and Associates, Inc. <br />MND for McDonald's Restaurant April 30, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.