Laserfiche WebLink
Obtain peak hour turning movement traffic count data at the intersection of Grand <br />Avenue and McFadden Avenue for three peals periods: <br />- AM peak hour (7:00 to 9:00 AM) <br />- Lunchtime peak hour (11:00 AM to 1:00 PM) <br />- PM peak hour (4:00 to 6:00 PM) <br />• Obtain daily traffic volumes on the roadway segments in the immediate vicinity of the <br />project site: <br />Grand Avenue, north and south of McFadden Avenue <br />McFadden Avenue, east and west of Grand Avenue <br />• Develop project trip generation estimates for the proposed project the morning, midday <br />(lunchtime), and evening peak hours. <br />The trip generation data that is available in the Institute of Transportation Engineers (ITE) <br />Trip Generation (8th Edition) publication for a fast-food restaurant with a drive-through <br />contains widely varying results for daily and peak hour periods, and the Rz values are very <br />low. The Trip Generation document also does not provide trip generation data for the <br />lunchtime peak period. <br />For these reasons, we propose to develop trip generation rates by other means: <br />- Kimley-Horn will first poll our Kimley-Horn offices across the country to see if any of <br />our colleagues have conducted trip generation studies for McDonald's. <br />- We will then conduct an internet search to see if trip generation data for McDonald's <br />is available from other sources. <br />- We will submit any data obtained through these efforts to City staff for review and <br />consideration. <br />- If, after review of the data, it is determined that trip generation data needs to be <br />collected locally, we will arrange for driveway counts at two local McDonald's for the <br />time periods listed above. We will request input from the project applicant and city <br />staff to identify two appropriate McDonald's locations for data collection. For <br />budgeting purposes, the cost for traffic data collection is assumed in this proposal. <br />• The El Cortez restaurant and banquet facility is currently operating on a limited schedule. <br />They are not open Monday through Wednesday, are open for lunch and dinner on <br />Thursday, and open only for dinner Friday through Sunday. We will consult with staff to <br />develop an appropriate approach to account for trip generation for the existing site <br />operation. <br />• Develop trip distribution assumptions for the project traffic, based on likely origins and <br />destinations of employees and customers, and current traffic patterns in the area. Project <br />traffic will be distributed through the study intersection and on area roadway segments, <br />and the project traffic contribution to each intersection will be identified. <br />miry or Santa Ana - 6 - Kimley-Horn and Associates, Inc. <br />MND for McDonald's Restaurant April 30, 2010 <br />