My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - AGMT - LANDSCAPE MAINT SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
02/22/2011
>
25H - AGMT - LANDSCAPE MAINT SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 2:03:46 PM
Creation date
2/17/2011 10:51:50 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25H
Date
2/22/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. General Maintenance and Clean-up For All Parks and Contracted Sites <br />a) All trash and debris on the ground or in trash receptacles shall be removed <br />from all worksites each day Monday through Sunday before 12:00 p.m. <br />This includes all landscape areas, paved areas, street curb gutters, flood <br />control channels, etc. <br />b) The contractor shall rake, hand remove, or vacuum leaves that are not <br />absorbed by planting. This shall be done as often as required to maintain a <br />neat appearance. <br />c) After heavy windstorms or other inclement weather that impacts sites <br />under this agreement, the Contractor shall bring in extra staff to clean all <br />parks areas within two (2) days at no cost to the City. Debris, such as but <br />not limited to, litter, fallen branches, trash, Iimbs, branches, soil erosion, <br />etc., shall be removed from the worksites. <br />d) The Contractor shall keep sidewalks and all other paved areas swept and <br />free of any debris, dirt, glass, weeds, leaves, etc. at all times. <br />e) Drain inlets shall be checked and if necessary cleaned once per day to <br />avoid flooding of areas during inclement weather. <br />15. Other Requirements <br />a) Work Not Scheduled <br />The Director may delete a portion of or the entire work site from <br />contractual maintenance during a construction period or any period where <br />the Director determines that work cannot be scheduled. The deletion of <br />this portion of work will be reflected as a reduction in the monthly <br />payment to the Contractor. The amount of reduction will be based on the <br />percentage of area involved and agreed upon by the City and the <br />Contractor in writing. <br />16. Special Maintenance <br />a) City of Santa Ana Corporation Yard - The Corporate Yard is the city's <br />maintenance operation center. In addition to the standard Grounds - <br />Landscape Specification the following special maintenance shall be <br />performed. <br />(I) All trash receptacles shall be emptied daily five (5) days per <br />week and replaced with new trash liners. The Contractor shall <br />install trash liners so as not to be seen on the exterior of the <br />receptacles. The Contractor shall be responsible for replacing <br />24 <br />25H -32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.