My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - AGMT - LANDSCAPE MAINT SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
02/22/2011
>
25H - AGMT - LANDSCAPE MAINT SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 2:03:46 PM
Creation date
2/17/2011 10:51:50 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25H
Date
2/22/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d) Annual Maintenance <br />(1) Top dress outfield turf using Aguanaga Santa Ana mix or approved <br />product. Apply with an approved top dressing machine that will <br />achieve a level playing surface. <br />e) Non - recurring maintenance: <br />During inclement weather the Contractor shall work to reopen baseball <br />fields as soon as possible. The Contractor shall use Diamond Dry or an <br />approved equal to warning tracts and fence lines. In addition, the <br />Contractor shall use hand pumps or any other reasonable method <br />necessary to drain water off the field. <br />12. Soccer /Football Field Maintenance <br />a) All soccer /football fields shall be inspected every day, Monday through <br />Friday. Contractor shall look for divots, depressions, debris, and other <br />turf marring conditions. If discovered, the Contractor shall fill in divots <br />and depressions with #20 white silica sand mixed with LaPrima XD <br />Bermuda grass seed during the spring/summer and Stovers Grand Slam <br />perennial rye grass seed during the fall winter to re- establish the areas. <br />b) Areas of the field where turf has been worn away due to play shall be <br />raked, dragged and leveled each day to provide a level - playing surface <br />free of divots, depressions and uneven surfaces. The Contractor shall add <br />approved topsoil to these areas as necessary to keep the areas level and <br />safe. <br />c) Annually, the Contractor shall top dress outfield turf using Aguanaga <br />Santa Ana mix or approved product. Apply with an approved top <br />dressing machine that will achieve a level playing surface. <br />13. Sport Court Maintenance <br />a) All sport courts shall be blown off daily. Courts and fence lines shall be <br />completely free of dirt, debris, etc. <br />b) All sport Courts shall be washed down every other week to remove dust, <br />gum and stains. The courts shall have water removed immediately <br />following the washing down. <br />c) Contractor shall replace tennis and basketball nets when they become <br />wom. The City shall fiimish nets. <br />23 <br />25H -31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.