My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - AGMT - LANDSCAPE MAINT SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
02/22/2011
>
25H - AGMT - LANDSCAPE MAINT SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 2:03:46 PM
Creation date
2/17/2011 10:51:50 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25H
Date
2/22/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
build -up with a sod cutter and re- establish the in -field boundaries <br />with a string line or suitable method and re -sod up to the border to <br />remedy the situation at contractors expense. Pre - existing <br />conditions shall be corrected during contract start -up. <br />7.6 Final Wateriniz <br />7.6.1 This is the most time consuming and a very important element of <br />the procedure. <br />7.6.2 The contractor shall final water the skinned brick dust to a depth of <br />'/4" minimum. <br />8.0 Rainy Weather/Wet Field Procedure <br />8.1 On the next scheduled working day after a rainfall, the following procedure, in the <br />order listed, shall be adhered to: <br />8.1.1 Remove all standing water from low spots either by skimming off <br />excess water and spreading it out to dry areas or using a <br />pump /sopper system. <br />8.1.2 Rake out (scarify) wet areas. <br />8.1.3 Apply Dry Gail Materials "Pro Gold with Stabilizer" Brick dust <br />Materials from stock to all Wet Areas and Rake Out. <br />9.0 Work to be Completed "BI-MONTHLY" <br />9.1 To maintain levelness of all fields, contractor shall, once every two months, <br />scarify drag built up amounts of materials at high spots and cut and level drag the <br />scarified material to low spots. The Contractor shall fill any remaining low spots <br />with new Gail Materials "Pro Gold with Stabilizer" brick dust from stock and <br />make level. <br />Note: Staff shall identify areas to scarify /cut and level <br />drag to the contractor at weekly meetings with <br />contractors appointed site supervisor (as per section <br />6.2 of contract). <br />9.2 Heavy water scarified and cut and leveled areas to a %" min. depth and allow <br />settling in before play on field. <br />Note: Due to heavy watering and its need to settle before <br />play, staff shall provide a schedule of bi- monthly <br />scarify /cut and level drag dates to contractor. <br />fd <br />25H -41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.