My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - AGMT - LANDSCAPE MAINT SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
02/22/2011
>
25H - AGMT - LANDSCAPE MAINT SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 2:03:46 PM
Creation date
2/17/2011 10:51:50 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25H
Date
2/22/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10.0 Work to be Completed "ANNUALLY" <br />10.1 Each year, the following renovation is to be done on all fields in conjunction with <br />the City's Annual Sports Turf Renovation Schedule. Fields renovated may <br />change from year to year. <br />10.1.1 Contractor shall laser grade each ball diamond. Contractor shall <br />scarify drag built up amounts of materials at high spots and cut and <br />level drag the scarified material to low spots. The Contractor shall <br />fill any remaining low spots with new Gail Materials "Pro Gold <br />with Stabilizer" brick dust from stock and make level. <br />Note: Staff shall identify areas to scarify /cut and level <br />drag at the November meeting with contractor's <br />owner (as per section 6.3 of contract). <br />10.1.2 Contractor shall verify all base distances, pitching rubber distances <br />and pitching mound heights per the Little League, Pony /Colt <br />League specifications for each specific field. Contractor shall <br />repair any specifications not being met on any field. <br />In addition, contractor shall install 1/2" new Gail Materials "Pro - <br />gold with Stabilizer" (brick dust) to in- fields at all diamonds <br />(minimum 26 tons per Girls Softball/Major Little League Field and <br />minimum 40 tons per Junior /Senior Little League Field). Also, the <br />contractor shall install a minimum of I ton of Turface calcite clay <br />per Girls Softball/Major Little League Field and 2 tons of Turface <br />calcite clay to Junior /Senior Little League Fields Responsibility for <br />and purchase of necessary materials shall be at contractor's <br />expense. <br />Note: The City has the right to move brick dust and <br />Turface materials to other infields under this <br />agreement should they decide that an infield or <br />infields do not require additional materials a <br />particular year. <br />11.0 Work To Be Completed "AS DIRECTED" <br />11.1 Replace Base ANCHORS as directed. (This will be considered extra work.) <br />Note: City of Santa Ana use's the Hollywood base <br />anchoring system. Contractor shall install base <br />anchors into the ground per manufacturer's <br />standards. Top of stake shall be approximately 2" <br />8 <br />25H -42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.