My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT - RIGHT-OF-WAY PROJECT MNGT SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
02/22/2011
>
25B - AGMT - RIGHT-OF-WAY PROJECT MNGT SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:52:33 PM
Creation date
2/17/2011 11:39:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25B
Date
2/22/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
services for all consultants. <br />2.4 Escrow Coordination - Provide coordination services with the escrow company, including <br />ordering Preliminary Title Reports, Litigation Guarantees, if required, opening escrows, facilitating <br />escrows for both acquisition of the subject property and replacement property. <br />2.5 Schedules - Prepare and provide to the City project schedules as needed. <br />2.6 QA/QC Management -Provide Quality Control Management for all areas-of the project, <br />including coordinating efforts with the City to ensure a successful and compliant project. <br />2.7 Project Close Out - Provide services required to finalize and close out the project accord- <br />ing to appropriate City, State and Federal regulations. <br />v.. 3.0 TITLE AND WATER RIGHTS SERVICES <br />p- TASK NP, <br />3.1 Preliminary Title Reports - Order and monitor completion of Preliminary Title Reports <br />and receipt of supporting documents. Title reports produced for each parcel will at a minimum <br />establish legal owners and all valid liens, encumbrances and easements of record. A Title Report <br />Summary will be completed by the Project Management Staff and with a copy distributed to the <br />City file, acquisition consultant and City Attorney's office. <br />ba 3.2 Litigation Guarantees - Order as directed by the City Attorney's office Litigation Guar- <br />' antees identifying the legal owners and all interests affected in the proposed litigation. Copies of <br />the report will be placed in the City file and copy distributed to the City Attorney's office. <br />a <br />4.0 PHASE I AND II ESA AND DEMOLITION ASBESTOS SURVEY <br />on <br />TASK NO. <br />En <br />4.1 Phase I Environmental Site Assessment Survey - A Phase I study has been per- <br />r, formed in compliance with the standard practices of the American Society for Testing and Materi- <br />als (ASTM) Phase I ESA Process (Standard: E 1527-00). Monitor to see that: reasonable attempts <br />03 are made to interview the existing and former owners of the properties; a visual survey of the <br />site and adjacent sites were made; a reasonable attempt was made to contact local government <br />r,3 <br />officials regarding conditions in connection with the property; a review site/area land use history; <br />M <br />Ws <br />25B-16 22
The URL can be used to link to this page
Your browser does not support the video tag.