My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19C - RFP - PARK LANDSCAPE MAINTENANCE SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
02/22/2011
>
19C - RFP - PARK LANDSCAPE MAINTENANCE SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:52:23 PM
Creation date
2/17/2011 11:55:29 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
19C
Date
2/22/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. ACCESS TO PRIVATE PROPERTY <br />Prior to any work involving private property, the Contractor shall notify the City of the <br />proposed work and obtain all necessary permits and/or consent required from City and/or <br />property owner. <br />G. PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS <br />The Contractor shall protect City and/or private property adjacent to work areas including <br />sprinkler systems, drain pipes, lawns, brick work, plantings, masonry work, fences, walls, <br />sidewalks, street paving, etc., located on either public or private property. Contractor shall, <br />at its expense, replace any property that is removed or damaged, other than property pre- <br />approved for removal. <br />Contractor shall abide by the City's "Policy for Driving on Park Property" (See Attachment <br />6). <br />H. TRAFFIC CONTROL <br />The Contractor will not interrupt traffic flow on City streets. In situations where it is <br />necessary to restrict traffic flow, the Contractor will contact the appropriate City <br />department and obtain all necessary permits and/or consent from the responsible public <br />agency. <br />1. MONTHLY REPORTS <br />Prior to the first day of each month the Contractor shall submit the following reports: 1) <br />employees daily work schedule by location and crew/task(s); 2) pesticide use report that <br />was forwarded to the Agricultural Commissioner's Office; 3) irrigation report; and, 4) <br />"green waste" recycling report. <br />J. WATER COST <br />City will pay for water used by Contractor pursuant to this agreement up to a specified <br />amount detailed in a monthly Estimated Applied Water (EAW) report. Should the amount <br />of water applied exceed the monthly EAW then the Contractor shall pay the cost of the <br />excess water. <br />II. GROUNDS/LANDSCAPE MAINTENANCE SPECIFICATIONS <br />A. DEFINITIONS <br />1. "Director" shall mean the Executive Director of Parks, Recreation and Community <br />Services or designated representative. <br />2. "Pruning" shall mean the practice of removing lateral shrub or tree branches and may <br />also be referred to as "trimming." <br />11 <br />19C-13
The URL can be used to link to this page
Your browser does not support the video tag.